Table of Contents

SECTION 1 INTRODUCTION 1-1

    1. Purpose 1-3

SECTION 2 SCORM 2004 DEFECT ADDENDA 2-1

    1. Handling of Invalid SetValue() Requests for Data Model Element Collections 2-3

    2. Ambiguous Pseudo-Code in Case #4 of Choice Sequencing Request Process 2-5

    3. Misevaluation of Traversal Direction 2-11

    4. Measure Rollup Should not be Applied to Leaf Activities 2-14

    5. Invalid Default Value Defined for the measureSatisfactionIfActive attribute 2-16

    6. Incorrect SPM for the <dataFromLMS> Element 2-17

    7. Handling of Reserved Delimiters 2-18

    8. Deprecating the adlcp:persistState Attribute 2-23

    9. Language Type Syntax 2-25

    10. Objective Satisfied By Measure Evaluation Behavior Discrepancy 2-26

    11. Manifest Requirements Inconsistency 2-29

    12. Error in Pseudo-Code Limit Conditions Check Process 2-31

    13. Error in Pseudo-Code Choice Flow Tree Traversal Sub-process 2-34

    14. Error in Pseudo-Code Previous Sequencing Request Process 2-36

    15. Application of Measure Satisfaction if Active Behavior 2-37

    16. Initialization of a SCO’s Objectives from Sequencing Information 2-40

    17. Variable Error in Measure Rollup Process (RB.1.1) 2-43

    18. Incorrect Definition of Extended Rollup Set 2-47

    19. Portability (Interoperability) of URLs between Windows and UNIX Systems 2-48

    20. The <adlnav:presentation> Element Should be Permitted on an Asset Resource 2-49

    21. Default Value for timeinterval(second,10,2) Should be any Value that Evaluates to Zero 2-51

    22. Exit Action Rule on the Activity Tree Root does not End the Sequencing Session 2-52

    23. The Completion Status Value of “not attempted” is Not Mapped to Sequencing Tracking

      Information 2-60

    24. Undefined Behavior for LMS Handling of Unique Identifier Collisions 2-62

    25. Clarification and Changes Needed for Non-Tracked Activities 2-64

    26. Error in Pseudo Code for the Choice Sequencing Request Process in Dealing with Constrained

Chioces 2-66

SECTION 3 SCORM 2004 CLARIFICATION/ENHANCEMENT ADDENDA 3-1

    1. Ambiguous Information Defined in the language_type Data Type 3-3

    2. Clarification of Learner Session Initialization Requirements 3-4

    3. Setting the Current Activity to None 3-6

    4. Incorrect Rollup Condition Definition 3-8

    5. Ambiguous Language for the timeinterval(second, 10,2) Data Requirements 3-9

    6. Incorrect Completion Status Determination/Success Status Determination Operators 3-10

    7. Conflicting Definitions of <adlnav:presentation> Element 3-11

    8. Root of the Activity Tree Cannot be Targeted for Choice 3-12

    9. Choice Exit not Enforced on the Activity Tree Root 3-25

APPENDIX A ACRONYM LISTING........................................................................................................... A-1

APPENDIX B DOCUMENT REVISION HISTORY ...................................................................................B-1


This page intentionally left blank.


SECTION 1

Introduction


This page intentionally left blank.


1.1. Purpose

The purpose of this document is to track all reported issues with SCORM 2004 2nd Edition that would require updates to the SCORM 2004 2nd Edition documentation suite. This document captures those issues and describes the corrections needed to address them. The information contained in this document supersedes information contained in the SCORM 2004 2nd Edition documentation suite. Vendors should adhere to all changes to SCORM 2004 2nd Edition as described in this document. The SCORM 2004 Conformance Test Suite will be updated to reflect the changes described in this document.

This document should be used in conjunction with the current SCORM 2004 2nd Edition documentation suite until a new edition of SCORM 2004 is published by ADL. This document will be updated to include additional corrections should they become known.

Please submit any additional known issues with SCORM 2004 2nd Edition to the ADL Technical Team via the Help & Info Center on ADLNet.org.

This document is divided into three major sections. Section 1 explains the purpose of the SCORM 2004 2nd Edition addendum. Section 2 describes addenda that are related to defects in the SCORM 2004 2nd Edition. These defects may affect conformance to SCORM 2004, depending on current implementations. Section 3 describes addenda that are clarifications or enhancements that do not affect SCORM 2004 conformance.


This page intentionally left blank.


SECTION 2

SCORM 2004 Defect Addenda


This page intentionally left blank.


    1. Handling of Invalid SetValue() Requests for Data Model Element Collections

      The SCORM 2004 RTE Version 1.3.1 does not clearly describe how to handle invalid SetValue() requests invoked against data model elements in a “to-be” created record of a data model element collection. More specifically, there is no specific statement of when a data model element record should be created in response to a SetValue() request invoked against one of its children, increasing the count of its containing collection.

      For example, assume that the value for cmi.comments_from_learner._count is zero (the SCO has not set any comments from learner) and the SCO attempts to make the following SetValue() request:

      SetValue(“cmi.comments_from_learner.0.comment”,”{lang=}”)

      This SetValue() request is invalid because the value provided for the language delimiter is not a valid language_type – it cannot be an empty string (refer to the SCORM 2004 RTE Version 1.3.1, Section 4.1.1.7: Data Types for requirements of a valid language_type). In this case, the LMS is required to return false and set the API error code to 406 – Data Model Element Type Mismatch.

      This issue is experienced when continuing the example. SCORM does not clearly define how an LMS should respond to the following GetValue() requests when they are invoked immediately following the previous SetValue() request.

      GetValue(“cmi.comments_from_learner.0.comment) GetValue(“cmi.comments_from_learner._count)


      1. Rationale for Change

        Invalid SetValue() requests (regardless of the data model element) always result in an LMS returning false and setting the API error code. The LMS is required to not alter the state of the data model element’s value. In the case where these SetValue() requests are invoked against data model elements in a “to-be” created record, not altering the state of the data model element implies that no record is created and that the containing collection’s size does not change.


      2. SCORM Update

        Section 4.1.1.3: Handling Collections found in the SCORM RTE Version 1.3.1 will be updated to include the following required behavior:

        Failure to set a data model element in a “to-be” created data model record does not result in any data being persisted and does not increase the containing collection size.

        The following child data model elements are affected by this change. If any of these elements is set successfully, it would cause a newly created record to be added to the containing collection, increasing the collection’s count by 1.

        • cmi.objectives.n.id

        • cmi.interactions.n.id

        • cmi.interactions.n.objectives.n.id

        • cmi.comments_from_learner.n.comment

        • cmi.comments_from_learner.n.location

        • cmi.comments_from_learner.n.timestamp

        When an LMS receives an invalid SetValue() request against one of these data model elements, the LMS will return false and set the appropriate API error code. The size of the containing collection shall not be incremented. If a _count request is made prior to the invalid SetValue() request and a _count request is made immediately after the invalid SetValue() request, then the value returned by both calls shall be identical (i.e., the collection size has not changed).

        An update will be made to define that if an LMS receives a GetValue() request immediately following an invalid SetValue() request, then the behavior shall be:

        1. Return an empty characterstring (“”)

        2. Set the API Error Code to 301 – General Get Failure


    2. Ambiguous Pseudo-Code in Case #4 of Choice Sequencing Request Process

      This addendum addresses a discrepancy found in Choice Sequencing Request Process (SB.2.9) of the SCORM 2004 Sequencing and Navigation (SN) Version 1.3.1. The discrepancy can be found in Case #4 which starts on line 11. Case #4 deals with the Choice Sequencing Request scenario where the target activity is an ancestor of the Current Activity. In this case, the Activity Tree traversal will be up the “active” path rather than across the tree; however, the pseudo code includes an evaluation of Constrained Choice attribute that requires an ambiguous traversal either Backward or Forward in the Activity Tree relative to the constrained activity.


      1. Rationale for Change

        When the target of a choice navigation request is an ancestor of the current activity (Case #4), the Constrained Choice attribute will have no effect. In Case #4, only the target or its immediate “next” activity (if the target is a cluster – SB.2.9, line 14), could possibly be identified for delivery, which is the intended effect of the Constrained Choice Attribute. In this case, the evaluation of Constrained Choice adds no value and potentially leads to an ambiguous traversal direction.


      2. SCORM Update

        The evaluation of the Constrained Choice attribute is unnecessary and ambiguous when performed during Case #4 of the Sequencing Choice Process. The Choice Sequencing Request Process (SB.2.9) will be updated to delete the pseudo-code that references the constrained activity in Case #4 (this includes lines 11.3, 11.4.2.*, and 11.5.*).

        The updated Choice Sequencing Process is reproduced in whole for easy reference.


        Choice Sequencing Request Process [SB.2.9] (for a target activity; may return a delivery request; may

        change the Current Activity; may return an exception code):

        Reference: Activity is Active AM.1.1; Activity is Suspended AM.1.1; Available Children AM.1.1; Check Activity Process UP.5; Choice Activity Traversal Subprocess SB.2.4; Current Activity AM.1.2; End Attempt Process UP.4; Flow Subprocess SB.2.3; Sequencing Control Mode Choice SM.1; Sequencing Control Choice Exit SM.1; Sequencing Rules Check Process UP.2; Terminate Descendent Attempts Process

        UP.3; adlseq:constrainedChoice SCORM SN; adlseq:preventActivation SCORM SN

        1.

        If there is no target activity Then

        There must be a

        target activity for choice

        1.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-1)

        Nothing to deliver


        End If


        2.

        If the target activity is not the root of the activity tree Then


        2.1.

        If the Available Children for the parent of the target activity does not

        The activity is



        contain the target activity Then

        currently not

        available

        2.1.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-2)

        Nothing to deliver


        End If



        End If


        3.

        Form the activity path as the ordered series of activities from the root of the

        activity tree to the target activity, inclusive


        4.

        For each activity in the activity path


        4.1.

        Apply the Sequencing Rules Check Process to the activity and the Hide from Choice sequencing rules

        Cannot choose something that is

        hidden

        4.2.

        If the Sequencing Rules Check Process does not return Nil Then


        4.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-3)

        Nothing to deliver


        End If



        End For


        5.

        If the target activity is not the root of the activity tree Then


        5.1.

        If the Sequencing Control Mode Choice for the parent of the target activity is False Then

        Confirm that control mode

        allow ‘choice’ of the target

        5.1.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-4)

        Nothing to deliver


        End If



        End If


        6.

        If the Current Activity is Defined Then

        Has the sequencing session already

        begun?

        6.1.

        Find the common ancestor of the Current Activity and the target activity


        7.

        Else


        7.1.

        Set common ancestor is the root of the activity tree

        No, choosing the target will start the sequencing

        session


        End If


        8.

        Case: Current Activity and target activity are identical

        Case #1 - select

        the current activity

        8.1.

        Break All Cases

        Nothing to do in

        this case


        End Case


        9.

        Case: Current Activity and the target activity are siblings

        Case #2 - same cluster; move toward the target

        activity

        9.1.

        Form the activity list as the ordered sequence of activities from the

        Current Activity to the target activity, exclusive of the target activity

        We are attempted to walk toward the target activity.

        Once we reach the target activity, we don’t need to test

        it.

        9.2.

        If the activity list is Empty Then

        Nothing to choose


        9.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-5)

        Nothing to deliver


        End If


        9.3.

        If the target activity occurs after the Current Activity in preorder

        traversal of the activity tree Then


        9.3.1.

        traverse is Forward


        9.4.

        Else


        9.4.1.

        traverse is Backward



        End If


        9.5.

        For each activity on the activity list


        9.5.1.

        Apply the Choice Activity Traversal Subprocess to the activity in

        the traverse direction


        9.5.2.

        If the Choice Activity Traversal Subprocess returns False Then


        9.5.2.1.

        Exit Choice Sequencing Request Process (Delivery Request:

        n/a; Exception: the exception identified by the Choice Activity Traversal Subprocess)

        Nothing to deliver


        End If



        End For


        9.6.

        Break All Cases



        End Case


        10.

        Case: Current Activity and common ancestor are the same Or Current Activity is Not Defined

        Case #3 - path to the target is forward in the

        activity tree

        10.1.

        Form the activity path as the ordered series of activities from the

        common ancestor to the target activity, exclusive of the target activity


        10.2.

        If the activity path is Empty Then


        10.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-5)

        Nothing to deliver


        End If


        10.3.

        For each activity on the activity path


        10.3.1.

        Apply the Choice Activity Traversal Subprocess to the activity in

        the Forward direction


        10.3.2.

        If the Choice Activity Traversal Subprocess returns False Then


        10.3.2.1.

        Exit Choice Sequencing Request Process (Delivery Request:

        n/a; Exception: the exception identified by the Choice Activity Traversal Subprocess)

        Nothing to deliver


        End If


        10.3.3.

        If Activity is Active for the activity is False And (the activity is Not the common ancestor And adlseq:preventActivation for the activity is True) Then

        If the activity being considered is not already active, make sure we are allowed to

        activate it

        10.3.3.1.

        Exit Choice Sequencing Request Process (Delivery Request:

        n/a; Exception: SB.2.9-6)

        Nothing to deliver


        End If



        End For


        10.4.

        Break All Cases



        End Case


        11.

        Case: Target activity is the common ancestor of the Current Activity

        Case #4 - path to the target is

        backward in the activity tree


        11.1.

        Form the activity path as the ordered series of activities from the

        Current Activity to the target activity, inclusive


        11.2.

        If the activity path is Empty Then


        11.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-5)

        Nothing to deliver


        End If


        11.3.

        For each activity on the activity path


        11.3.1.

        If the activity is not the last activity in the activity path Then


        11.3.1.1.

        If the Sequencing Control Choice Exit for the activity is False

        Then

        Make sure an activity that should not exit

        will exit if the target is delivered.

        11.3.1.1.1.

        Exit Choice Sequencing Request Process (Delivery

        Request: n/a; Exception: SB.2.9-7)

        Nothing to deliver


        End If



        End If



        End For


        11.4.

        Break All Cases



        End Case


        12.

        Case: Target activity is forward from the common ancestor activity

        Case #5 - target is a descendent activity of the

        common ancestor

        12.1.

        Form the activity path as the ordered series of activities from the

        Current Activity to the common ancestor, inclusive


        12.2.

        If the activity path is Empty Then


        12.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-5)

        Nothing to deliver


        End If


        12.3.

        Set constrained activity to Undefined


        12.4.

        For each activity on the activity path

        Walk up the tree

        to the common ancestor

        12.4.1.

        If the activity is not the last activity in the activity path Then


        12.4.1.1.

        If the Sequencing Control Choice Exit for the activity is False

        Then

        Make sure an activity that should not exit

        will exit if the target is delivered

        12.4.1.1.1.

        Exit Choice Sequencing Request Process (Delivery

        Request: n/a; Exception: SB.2.9-7)

        Nothing to deliver


        End If



        End If


        12.4.2.

        If constrained activity is Undefined Then

        Find the closest constrained activity to the

        current activity

        12.4.2.1.

        If adlseq:constrainedChoice for the activity is True Then


        12.4.2.1.1.

        Set constrained activity to activity



        End If



        End If



        End For


        12.5.

        If constrained activity is Defined Then



        12.5.1.

        If the target activity is Forward in the activity tree relative to the

        constrained activity Then


        12.5.1.1.

        traverse is Forward

        ‘Flow’ in a forward direction to see what activity comes

        next

        12.5.2.

        Else


        12.5.2.1.

        traverse is Backward

        ‘Flow’ in a backward direction to see what activity

        comes next


        End If


        12.5.3.

        Apply the Choice Flow Subprocess to the constrained activity in

        the traverse direction


        12.5.4.

        Set activity to consider to the activity identified by the Choice Flow

        Subprocess


        12.5.5.

        If the target activity is Not an available descendent of the activity to consider And (the target activity is Not the constrained activity Or the target activity is Not the activity to consider) Then

        Make sure the target activity is within the set of ‘flow’ constrained

        choices

        12.5.5.1.

        Exit Choice Sequencing Request Process (Delivery Request:

        n/a; Exception: SB.2.9-8)



        End If



        End If


        12.6.

        Form the activity path as the ordered series of activities from the

        common ancestor to the target activity, exclusive of the target activity


        12.7.

        If the activity path is Empty Then


        12.7.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-5)

        Nothing to deliver


        End If


        12.8.

        If the target activity is forward in the activity tree relative to the Current

        Activity Then

        Walk toward the

        target activity

        12.8.1.

        For each activity on the activity path


        12.8.1.1.

        Apply the Choice Activity Traversal Subprocess to the activity

        in the Forward direction


        12.8.1.2.

        If the Choice Activity Traversal Subprocess returns False

        Then


        12.8.1.2.1.

        Exit Choice Sequencing Request Process (Delivery Request: n/a; Exception: the exception identified by the

        Choice Activity Traversal Subprocess)

        Nothing to deliver


        End If


        12.8.1.3.

        If Activity is Active for the activity is False And (the activity is Not the common ancestor And adlseq:preventActivation for the activity is True) Then

        If the activity being considered is not already active, make sure we are allowed to

        activate it

        12.8.1.3.1.

        Exit Choice Sequencing Request Process (Delivery

        Request: n/a; Exception: SB.2.9-6)

        Nothing to deliver


        End If



        End For



        12.9.

        Else


        12.9.1.

        For each activity on the activity path


        12.9.1.1.

        If Activity is Active for the activity is False And (the activity is Not the common ancestor And adlseq:preventActivation for the activity is True) Then

        If the activity being considered is not already active, make sure we are allowed to

        activate it

        12.9.1.1.1.

        Exit Choice Sequencing Request Process (Delivery

        Request: n/a; Exception: SB.2.9-6)

        Nothing to deliver


        End If



        End For



        End If


        12.10.

        Break All Cases



        End Case


        13.

        If the target activity is a leaf activity Then


        13.1.

        Exit Choice Sequencing Request Process (Delivery Request: the target

        activity; Exception: n/a)



        End If


        14.

        Apply the Flow Subprocess to the target activity in the Forward direction with consider children equal to True

        The identified activity is a cluster. Enter the cluster and attempt to find a

        descendent leaf to deliver

        15.

        If the Flow Subprocess returns False Then

        Nothing to deliver, but we succeeded in reaching the target activity - move the

        current activity

        15.1.

        Apply the Terminate Descendent Attempts Process to the common

        ancestor


        15.2.

        Apply the End Attempt Process to the common ancestor


        15.3.

        Set the Current Activity to the target activity


        15.4.

        Exit Choice Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.9-9)

        Nothing to deliver

        16.

        Else


        16.1.

        Exit Choice Sequencing Request Process (Delivery Request: for the

        activity identified by the Flow Subprocess; Exception: n/a)



        End If


        pseudo code for choice sequencing request process


    3. Misevaluation of Traversal Direction

      This addendum addresses an error discovered in the Flow Activity Traversal Subprocess (SB.2.2) of the SCORM 2004 SN Version 1.3.1. The error prevents the proper reversal of the flow traversal direction during the evaluation of a Previous sequencing request.

      This case only occurs when a Forward Only cluster is encountered and all of its children are skipped during the evaluation of a Previous sequencing request. In this case, the Flow Activity Traversal Subprocess needs to switch direction twice, once to move forward through the Forward Only cluster and then once again to continue to move backward (honoring the original request) from the Forward Only cluster to its predecessor.


      1. Rationale for Change

        This error is a bug in the SCORM Sequencing pseudo code. A strict implementation of the SCORM Sequencing pseudo code would prevent an LMS from recognizing a change in traversal direction and from successfully passing the SCORM Sequencing Conformance Test Case CM-3b.


      2. SCORM Update

        Line 3.3.1 of the Flow Activity Traversal Subprocess (SB.2.2) will be updated. The currently referenced (local variable) “traversal direction” will be updated to “previous traversal direction.”

        The updated Flow Activity Traversal Subprocess is reproduced in whole for easy reference.


        Flow Activity Traversal Subprocess [SB.2.2] (for an activity, a traversal direction, and a previous traversal

        direction; returns the ‘next’ activity in a directed traversal of the activity tree and True if the activity can be delivered; may return an exception code):

        Reference: Check Activity Process UP.5; Flow Activity Traversal Subprocess SB.2.2; Flow Tree Traversal

        Subprocess SB.2.1; Sequencing Control Flow SM.1; Sequencing Rules Check Process UP.2

        1.

        If Sequencing Control Flow for the parent of the activity is False Then

        Confirm that

        ‘flow’ is enabled

        1.1.

        Exit Flow Activity Traversal Subprocess (Deliverable: False; Next

        Activity: the activity; Exception: SB.2.2-1)



        End If


        2.

        Apply the Sequencing Rules Check Process to the activity and its Skipped

        sequencing rules


        3.

        If the Sequencing Rules Check Process does not return Nil Then

        Activity is skipped, try to go to the

        ‘next’ activity

        3.1.

        Apply the Flow Tree Traversal Subprocess to the activity in the traversal direction and the previous traversal direction with consider

        children equal to False



        3.2.

        If the Flow Tree Traversal Subprocess does not identify an activity

        Then


        3.2.1.

        Exit Flow Activity Traversal Subprocess (Deliverable: False; Next Activity: the activity; Exception: exception identified by the Flow

        Tree Traversal Subprocess)


        3.3.

        Else


        3.3.1.

        If the previous traversal direction is Backward And the Traversal Direction returned by the Flow Tree Traversal Subprocess is Backward Then

        Make sure the recursive call is considers the

        correct direction

        3.3.1.1.

        Apply the Flow Activity Traversal Subprocess to the activity identified by the Flow Tree Traversal Subprocess in the traversal direction and a previous traversal direction of n/a

        Recursive call – make sure the ‘next’ activity is

        OK

        3.3.2.

        Else


        3.3.2.1.

        Apply the Flow Activity Traversal Subprocess to the activity identified by the Flow Tree Traversal Subprocess in the

        traversal direction and a previous traversal direction of previous traversal direction

        Recursive call –

        make sure the

        ‘next’ activity is OK


        End If


        3.3.3.

        Exit Flow Activity Traversal Subprocess - (Return the results of the

        recursive Flow Activity Traversal Subprocess)

        Possible exit from

        recursion


        End If



        End If


        4.

        Apply the Check Activity Process to the activity

        Make sure the

        activity is allowed

        5.

        If the Check Activity Process returns True Then


        5.1.

        Exit Flow Activity Traversal Subprocess (Deliverable: False; Next

        Activity: the activity; Exception: SB.2.2-2)



        End If


        6.

        If the activity is not a leaf node in the activity tree Then

        Cannot deliver a non-leaf activity; enter the cluster

        looking for a leaf

        6.1.

        Apply the Flow Tree Traversal Subprocess to the activity in the

        traversal direction and a previous traversal direction of n/a with consider children equal to True


        6.2.

        If the Flow Tree Traversal Subprocess does not identify an activity

        Then


        6.2.1.

        Exit Flow Activity Traversal Subprocess (Deliverable: False; Next

        Activity: the activity; Exception: exception identified by the Flow Tree Traversal Subprocess)


        6.3.

        Else


        6.3.1.

        If the traversal direction is Backward And the traversal direction returned by the Flow Tree Traversal Subprocess is Forward Then

        Check if we are flowing backward through a forward only cluster - must move forward

        instead

        6.3.1.1.

        Apply the Flow Activity Traversal Subprocess to the activity identified by the Flow Tree Traversal Subprocess in the Forward direction with the previous traversal direction of

        Backward

        Recursive call – Make sure the identified activity

        is OK

        6.3.2.

        Else



        6.3.2.1.

        Apply the Flow Activity Traversal Subprocess to the activity identified by the Flow Tree Traversal Subprocess in the traversal direction and a previous traversal direction of n/a

        Recursive call –

        Make sure the

        identified activity is OK


        End If


        6.3.3.

        Exit Flow Activity Traversal Subprocess - (Return the results of

        the recursive Flow Activity Traversal Subprocess)

        Possible exit from

        recursion


        End If



        End If


        7.

        Exit Flow Activity Traversal Subprocess (Deliverable: True; Next

        Activity: the activity; Exception: n/a )

        Found a leaf

        pseudo code for flow activity traversal subprocess


    4. Measure Rollup Should not be Applied to Leaf Activities

      This addendum addresses a side effect discovered in the Overall Rollup Process (RB.1.5) found in the SCORM 2004 SN Version 1.3.1. The side effect discovered prevents scores reported by SCOs from being utilized during sequencing evaluations. Section 4.6.1: Overall Rollup Process of the SCORM 2004 SN Version 1.3.1 defines when the Overall Rollup Process is applied through its extended rollup process and some rules constraining how that rollup is evaluated. Each time the Overall Rollup Process is invoked, it applies the various rollup subprocesses to each activity along the “active path” – the path from the Current Activity (typically a leaf) and the root of the Activity Tree. For each activity, even a Current Activity that happens to be a leaf, the Measure Rollup Process (RB.1.1) is applied. However, the purpose of the Measure Rollup Process is to aggregate (rollup) the measures of the target activity’s children. If none of the activity’s children have a measure or if the activity has no children, the resulting measure is “unknown.”


      1. Rationale for Change

        A strict implementation of the SCORM Sequencing pseudo code would result in all delivered leaf activities having a measure of “unknown” because the Measure Rollup Process would interpret the lack of counted measures as an indication that the rolled up measure should be “unknown” (RB.1.1, line 5.2.1). For sequencing purposes, the “unknown” value would be used instead of any measure provided by a SCO (cmi.score.scaled), defeating the intent of mapping SCORM Run-Time Data to the associated activity’s tracking data. The net result would prevent an LMS from successfully passing several of the measure-based SCORM Sequencing Conformance Test Cases (MS-*).


      2. SCORM Update

        Although Section 4.6.1: Overall Rollup Process of the SCORM 2004 SN Version 1.3.1 states that “Rollup rules have no effect if defined on a leaf activity – there is nothing to rollup”, this instruction could be interpreted as applying only to Rollup Rule Descriptions, as defined in the Sequencing Definition Model, and not to general measure rollup. To ensure that there is no ambiguity in defined sequencing behaviors, the following bullet will be added to the SCORM 2004 SN Version 1.3.1 in Section 4.6.1:

        • Measure rollup is not applied to leaf activities.

          In addition, a clause will be added to the Overall Rollup Process (RB.1.5) that applies to line 3.1. The clause will ensure that the Measure Rollup Process (RB.1.1) is not applied to leaf activities. This change is normative behavior and will enforce that all implementation will utilize the measure reported by a SCO for sequencing purposes.

          The updated Overall Rollup Process is reproduced in whole for easy reference.


          Overall Rollup Process [RB.1.5] (for an activity; may change the tracking information for the activity and

          its ancestors):

          Reference: Activity Progress Rollup Process RB.1.3; Measure Rollup Process RB.1.1; Objective Rollup

          Process RB.1.2; Tracked SM.11; Tracking Model TM

          1.

          Form the activity path as the ordered series of activities from the root of the

          activity tree to the activity, inclusive, in reverse order.


          2.

          If the activity path is Empty Then


          2.1.

          Exit Overall Rollup Process

          Nothing to rollup


          End If


          3.

          For each activity in the activity path


          3.1.

          If the activity has children Then

          Only apply

          Measure Rollup to non-leaf activities

          3.1.1.

          Apply the Measure Rollup Process to the activity

          Rollup the

          activity’s measure


          End If


          3.2.

          Apply the appropriate Objective Rollup Process to the activity

          Apply the appropriate behavior described in section RB.1.2, based on the activity’s defined

          sequencing information

          3.3.

          Apply the Activity Progress Rollup Process to the activity

          Apply the appropriate behavior described in section RB.1.3, based on the activity’s defined sequencing

          information


          End For


          4.

          Exit Overall Rollup Process


          pseudo code for overall rollup process


    5. Invalid Default Value Defined for the measureSatisfactionIfActive attribute

      This addendum address an error found in the SCORM Content Aggregation Model (CAM) Version 1.3.1. Section 5.1.11: <rollupConsiderations> Element contains an optional attribute named measureSatisfactionIfActive. This attribute is defined with an incorrect default value. The value defined in the CAM is false. The default value of the measureSatisfactionIfActive should be true. The adlseq_v1p3.xsd correctly identifies the default value as true.


      1. Rationale for Change

        This change is being made to correctly identify the default value of the

        measureSatisfactionIfActive attribute.


      2. SCORM Update

        The measureSatisfactionIfActive attribute defined for the

        <rollupConsiderations> element found in Section 5.1.11: <rollupConsiderations> Element will be updated to change the default value of the measureSatisfactionIfValid to true. The section will be updated as follows:

        From:


        • measureSatisfactionIfActive (optional, default value = false). This attribute indicates if the measure should be used to determine satisfaction during rollup when the activity is active. XML Data Type: xs:boolean.

To:



    1. Incorrect SPM for the <dataFromLMS> Element

      This addendum addresses and error in the definition of the Smallest Permitted Maximum (SPM) for the ADL Content Packaging extension element <adlcp:dataFromLMS>. The SCORM 2004 CAM Version 1.3.1 incorrectly defines the SPM for the

      <adlcp:dataFromLMS> element’s value as 4096 characters.


      1. Rationale for Change

        The ADL Content Packaging Extension element, <adlcp:dataFromLMS>, is used to initialize the cmi.launch_data SCORM 2004 RTE Data Model element. The cmi.launch_data data model element has a defined SPM of 4000 characters. The IEEE Data Model Standard defines the SPM of the Launch Data element (i.e., maps to the cmi.launch_data model element) as 4000 characters. Since SCORM defines that the

        <adlcp:dataFromLMS> element is used to initialize the cmi.launch_data data model element, then the SPMs should match.


      2. SCORM Update

        The Data Type section of the <dataFromLMS> element found in Section 3.4.1.14:

        <dataFromLMS> Element will be updated to change the SPM for the element’s value from 4096 characters to 4000 characters. The section will be updated as follows:

        From:


        Data Type: The <dataFromLMS> element is represented as a characterstring element. The characterstring has an SPM of 4096 characters.

To:


Data Type: The <dataFromLMS> element is represented as a characterstring element. The characterstring has an SPM of 4000 characters.


    1. Handling of Reserved Delimiters

      This addendum addresses various issues involving a discrepancy between the types of delimiters and the requirements on the syntax and placement of delimiters used by the SCORM 2004 RTE Data Model dot-notation binding in the SCORM 2004 RTE Version 1.3.1.


      1. Rationale For Change

        This change is being made to remove the discrepancies between the types of delimiters, syntax requirements for each type and placement requirements for each type. The current text is confusing and does not clearly address these issues.


      2. SCORM Update

        The following updates will be made to Section 4.1.1.6: Reserved Delimiters:

        • Table 4.1.1.6a will be broken up to resolve the ambiguity between the two types of delimiters (Property and Separator delimiters).

        • The section will be updated to describe the Property Delimiter Syntax Requirements, Property Delimiter Placement Syntax, Separator Delimiter Syntax Requirements and Separator Placement Syntax.

          As mentioned above, Table 4.1.1.6a, will be broken up into two tables. Table 4.1.1.6a will be updated to describe the Reserved Property Delimiters as follows:

          Table 4.1.1.6a: Reserved Property Delimiters

          Reserved Delimiter Syntax

          Default Value

          Example

          {lang=<language_type>}

          {lang=en}

          {lang=en}

          {case_matters=<boolean>}

          {case_matters=false}

          {case_matters=true}

          {case_matters=false}

          {order_matters=<boolean>}

          {order_matters=true}

          {order_matters=true}

          {order_matters=false}


          Because these delimiters are not required, the default value shall be assumed for those cases where the delimiter is not specified. If the delimiters are used in the characterstring, there are other requirements on placement of the delimiter and the delimiter syntax.

          Property Delimiter Syntax Requirements: The delimiter shall be treated as a constant set of characters with the following format::

          delimiter ::= “{“ + name + “=” + value + “}”

          NOTE: The “{“ and “}” are required to indicate the beginning and ending portions of a delimiter. The “=” is required to separate the name and value pieces of the delimiter.

          The absences of these required characters will cause the delimiter to not be recognized by the system; instead, the set of characters will be treated as part of the underlying characterstring data value.

          The name represents the identifier of the delimiter. The name is represented by a set of reserved tokens:

          • lang

          • case_matters

          • order_matters

            For the {lang=<language_type>} delimiter to be recognized as the language for the characterstring, it must be placed at the beginning of the characterstring being qualified. If the {lang=<language_type>} delimiter is not the first set of characters, then the default language shall be assumed.

            The name token must be represented as-is (i.e., one of the following: lang, case_matters or order_matters). Any derivatives of these tokens (e.g., padding the token names with white space) will result in an unrecognized delimiter and the set of characters will be treated as part of the underlying characterstring.

            The value indicates the value for the named delimiter. The value portion of the delimiter is restricted to the following:

          • lang: Restricted to the value represented by a language_type (Refer to Section 4.1.1.7: Data Types for requirements of a language_type).

          • case_matters: Restricted to either true or false

          • order_matters: Restricted to either true or false

            NOTE: If the value does not meet its named delimiter’s type requirements, then the delimiter is improperly formed and the characterstring does not meet the requirements of its type (i.e., causing a 406 – Data Type Mismatch error to occur).

            Valid Examples:

          • SetValue(“cmi.comments_from_learner.0.comment”,

            ”{lang=en}Characterstring in the English language”)

          • SetValue(“cmi.interactions.0.correct_response.0.pattern”,

            ” {lang=en}{case_matters=true}Characterstring in the English language where the case matters”)

          • SetValue(“cmi.comments_from_learner.0.comment”,

          ”{lang =fr}Characterstring in the English language”)

          There is no delimiter qualifying this Characterstring – “{lang =fr}” is not considered a language delimiter because it contains white space, which is not lexically equivalent to the lang reserved delimiter. In this case, the overall Characterstring includes {lang =fr} and is still considered valid; its default language is English (“en”). If this SetValue call is invoked, the LMS shall set the data model element associated with the call to

          ”{lang =fr}Characterstring in the English language”, set the error code to 0 – No error and return true.

          • SetValue(“cmi.comments_from_learner.0.comment”,

            ”{case_matters=invalid}Characterstring in the English language”)

            There are no delimiters qualifying this Characterstring – “{case_matters=invalid” is not part of the defined format for cmi.comments_from_learner.n.comment. In this case the overall Characterstring includes {case_matters=invalid} and is still considered valid; its default language is English (“en”). If this SetValue call is invoked, the LMS shall set the data model element associated with the call to ”{case_matters=invalid}Characterstring in the English language”, set the error code to 0 – No error and return true.

            Invalid Examples:

          • SetValue(“cmi.interaction.0.correct_response.0.pattern”, ”{case_matters=invalid}{lang=en}Characterstring in the English language”)

            Assuming that the type of cmi.interaction.0 is fill-in, the case matters delimiter is invalid because it requires a value of true or false. This example uses “invalid.” Because the delimiter is improperly formed, an LMS should not set the data model element associated with the call, set the error code to 406 – Data Type Mismatch, and return false.

          • SetValue(“cmi.comments_from_learner.0.comment”,

            ”{lang= fr}Characterstring in the French language”)

            In this example, the lang delimiter is invalid because its value includes white space, which is not part of a valid language string. Because the delimiter is improperly formed an LMS should not set the data model element associated with the call, set the error code to 406 – Data Type Mismatch, and return false.

            Property Delimiter Placement Requirements: The delimiters are required to be placed in specific positions within the characterstring. In those cases where a combination of delimiters may be used, the order of the delimiters is described by the data model element. If a default value is used (implied by the absence of a delimiter) for one of the delimiters in the set of delimiters, then the order should still be preserved. The delimiters shall be concatenated together with no white space permitted between the delimiters. For example:

          • {case_matters=true}{order_matters=true}

          No white space or other characters are permitted prior to the first delimiter identified in the characterstring. If there are no delimiters, which implies that the default values are being used, then the value represents the characterstring used for the data model element.

          NOTE: If any white space or other character is found at the beginning of the characterstring, then this will cause the set of characters to be treated as part of the underlying characterstring.

          As mentioned above, Table 4.1.1.6a will be broken up into two tables. Table 4.1.1.6b will be updated to describe the Reserved Separator Delimiters as follows:

          Table 4.1.1.6b: Reserved Separator Delimiter

          Reserved Delimiter Syntax

          Default Value

          Example

          [.]

          Not applicable, needs to be provided

          Used to separate a pair of values that are related for an interaction:

          1[.]a

          [,]

          Not applicable, needs to be provided

          Used to separate a set of values for an interaction’s collection:

          1[.]a[,]2[.]c[,]3[.]b

          [:]

          Not applicable, needs to be provided

          Used to represent a separator between a range of numeric values:

          1[:]100 – a range where the numeric value is between 1 and 100 (inclusive)


          Separator Delimiter Syntax Requirements: The delimiter shall be treated as a constant set of characters with the following format::

          delimiter ::= “[“ + reserved_character + “]”

          NOTE: The “[“ and “]” are required to indicate the beginning and ending portions of the delimiter. The absences of these required characters will cause the delimiter to not be recognized by the system; instead, the set of characters will be treated as part of the underlying characterstring.

          The reserved_character represents the defined separator. The reserved_character

          is represented by a set of reserved tokens:

          • .

          ,

          • :

            NOTE: The reserved_character token must be represented as-is (i.e., one of the following: [.], [,] or [:]). Any derivatives of these tokens (e.g., padding the reserved_character tokens with white space) will result in an unrecognized delimiter and the set of characters will be treated as part of the underlying characterstring.

            Separator Delimiter Placement Requirements: The delimiters are required to be placed in specific positions within the characterstring. The delimiter is used to separate various data values defined by a particular data model element. For more information on the data model elements that use these separator delimiters refer to Section 4.2: SCORM Run-Time Environment Data Model.


    2. Deprecating the adlcp:persistState Attribute


      This addendum addresses the deprecation of the adlcp:persistState attribute and its associated run-time behavior.


      1. Rationale For Change

        This change is being made to resolve potential run-time behavior discrepancies related to the initialization, management, and persistence of Run-Time Data associated with a new learner attempt on a SCO whose associated learning resource has been tagged with an adlcp:persistState attribute equal to true.


      2. SCORM Update

        It has been determined through a review of the use cases related to the adlcp:persistState attribute, that the intention of the adlcp:persistState attribute has been superseded by the development of various e-learning standards and specifications. The removal of the adlcp:persistState attribute will ensure that complimentary emerging technologies and specifications can incorporate a more comprehensive solution to the existing use cases without burdening LMSs and content developers with, potentially complex and confusing, legacy support.

        The following updates will be made to the SCORM 2004 CAM Version 1.3.1:

        • Section 3.4.1.21: <resource> Element will be updated to remove the adlcp:persistState attribute definition and declaration.

        • Code Illustration 3-19 will be updated to remove the use of the adlcp:persistState attribute.

        • Table 3.5.3.a will be updated to remove the adlcp:persistState attribute from the table.

          The following updates will be made to the SCORM 2004 RTE Version 1.3.1:

        • Section 2.1.1.2: Persisting Run-Time Data Across Learner Attempts and Activities

          will be removed.

        • References to using Persist State will be removed from Section 4.2.17: Objectives

          and Section 4.2.23: Suspend Data.

          The following updates will be made to the ADL Content Packaging Extension XML Schema Definition (XSD) file – adlcp_v1p3.xsd:

          • Upon the formal release of an updated version of the SCORM 2004 documentation suite, the adlcp_v1p3.xsd will be updated to remove the attribute declaration of the adlcp:persistState.


    3. Language Type Syntax

      This addendum addresses unclear language in Section 4.1.1.7: Data Types in the SCORM 2004 RTE Version 1.3.1 on the requirements for the language_type data type.


      1. Rationale For Change

        The syntax and length restrictions for a langcode and subcode are ambiguous. The underlying standards (See Internet Engineering Task Force [IETF] Request For Comment [RFC] 3066 <http://www.ietf.org/rfc/rfc3066.txt>) indicate that the length of the langcode and each subcode range between a minimum of 1 to a maximum of 8 characters. This information is currently not provided in SCORM.


      2. SCORM Update

        Section 4.1.1.7: Data Types of the SCORM 2004 RTE Version 1.3.1 will be updated to add language stating that the langcode and subcode shall be 1 to 8 characters in length. Supplemental information will also be provided in relation to RFC 3066.


    4. Objective Satisfied By Measure Evaluation Behavior Discrepancy

      This addendum addresses a behavioral allocation change regarding the threshold evaluation of a mastery score and the effects of that evaluation on SCORM 2004 RTE Data Model and Sequencing Tracking Data.


      1. Rationale For Change

        The SCORM Run-Time Environment Version 1.3.1 defines an LMS behavior that applies an evaluation of cmi.score.scaled against a defined threshold, cmi.scaled_passing_score. The SCORM 2004 RTE Version 1.3.1, in Table 4.2.22.1a, describes this evaluation applied to various sets of SCO Data Model elements.

        In addition, SCORM 2004 SN Version 1.3.1 defines a similar behavior that conditionally, based on the value of Objective Satisfied by Measure, applies a threshold evaluation to an activity’s reported measure against a known minimum measure. The SCORM 2004 SN Version 1.3.1, Section 4.2.1.7: Tracking Behavior, requirement 5, defines this behavior.

        In some situations, the threshold evaluation applied to a SCO’s RTE data by an LMS may produce a different result than the threshold evaluation applied to the SCO’s associated activity by a sequencing implementation. This discrepancy may be confusing to both LMS implementers and content developers.


      2. SCORM Update

        To remove the potential discrepancy in success (satisfaction) status determination, the SCO Run-Time behavior will be updated to produce results consistent with the mastery evaluation applied to the SCO’s associated activity. This change will require the following updates to SCORM:

        SCORM 2004 CAM Version 1.3.1

        Section 5.1.7.1.1: <minNormalizedMeasure> Element

        From:


        The <minNormalizedMeasure> element identifies minimum satisfaction measure for the objective [5]. The value is normalized between –1 and 1 (inclusive). If this element is used to define a minimum satisfaction measure for the primary objective (i.e.,

        <primaryObjective> element), then the LMS shall use this value to initialize the

        cmi.scaled_passing_score (See the SCORM RTE Book[2]).

To:


The <minNormalizedMeasure> element identifies minimum satisfaction measure for the objective [5]. The value is normalized between –1 and 1 (inclusive). If the primary objective (i.e., <primaryObjective> element) has satisfiedByMeasure equal to true, the LMS shall use this value to initialize the cmi.scaled_passing_score (See the SCORM RTE Book[2]).


SCORM 2004 RTE Version 1.3.1

Section 4.2.19: Scaled Passing Score

From:


LMS Behavior Requirements:

<imsss:primaryObjective> element for the <imscp:item> element that references the SCO is equal to false, then the LMS shall not make any assumptions of a scaled passing score.

LMS Behavior Requirements:

To:



Table 4.2.22.1a, last row:

From:


Scaled Passing Score

Scaled Score

Success Status

LMS Behavior

0.8

No value set by the SCO.

One of the defined vocabularies

No action, the cmi.success_status shall be set to the value that was set by the SCO.

To:


Scaled Passing Score

Scaled Score

Success Status

LMS Behavior

0.8

No value set by the SCO.

One of the defined vocabularies

The cmi.success_status set by the SCO shall be overwritten, and replaced with the default value “unknown”.

SCORM 2004 SN Version 1.3.1

Table 3.10a:

From:


No

Name

Description

Value Space

Default Value

3

Objective

Indicates the minimum satisfaction

Real [-1..1]

1.0


Minimum

measure for the objective. If the

Precision of



Satisfied

objective’s measure equals or

at least 4



Normalized

exceeds this threshold, the

significant



Measure

Objective Satisfied Status will

decimal




become Satisfied, otherwise the

digits




Objective Satisfied Status will





become Not Satisfied.



To:


No

Name

Description

Value Space

Default Value

3

Objective Minimum Satisfied Normalized Measure

Indicates the minimum satisfaction measure for the objective. If the objective’s measure equals or exceeds this threshold, the Objective Satisfied Status will become Satisfied, otherwise the Objective Satisfied Status will become Not Satisfied.

Real [-1..1]

Precision of at least 4 significant decimal digits

1.0



The value is unreliable unless

Objective Satisfied by Measure is True.



Section 3.10: Objective Description

The ADL Note found on page SN-3-39 will be removed from the SCORM 2004 SN Version 1.3.1. The behavior described in this note was based on an assumption made in an early draft of SCORM 2004 that is no longer applies due to changes introduced by this addenda.


    1. Manifest Requirements Inconsistency

      This addendum addresses an inconsistency between element requirements in the SCORM 2004 CAM Version 1.3.1, Table 3.5.3a and Section 3.4.1.2: <metadata> Element.


      1. Rationale For Change

        Table 3.5.3a incorrectly states that the 1.4.1 <schema> and 1.4.2 <schemaversion> elements are optional, marked with an O in the table. This information contradicts the information found in Section 3.4.1.2: <metadata> Element, which correctly states these elements are mandatory for a Content Aggregation Package and Resource Package. The language in the SCORM 2004 Conformance Requirements Version 1.1 also states that these elements are mandatory.


      2. SCORM Update

        The language in Table 3.5.3a will be updated to state that the 1.4.1 <schema> and 1.4.2

        <schemaversion> elements tags are mandatory.


        No.

        Elements

        Resource Package

        Content Aggregation Package

        1

        <manifest>

        M

        M

        1.1

        identifier

        M

        M

        1.2

        version

        O

        O

        1.3

        xml:base

        O

        O

        1.4

        <metadata>

        O

        O

        1.4.1

        <schema>

        M

        M

        1.4.2

        <schemaversion>

        M

        M

        1.4.3

        {Meta-data}

        O

        O

        1.5

        <organizations>

        M

        M

        1.5.1

        default

        NP

        M

        1.5.2

        <organization>

        NP

        M

        1.5.2.1

        identifier

        NP

        M

        1.5.2.2

        structure

        NP

        O

        1.5.2.3

        adlseq:objectivesGlobalToSystem

        NP

        O

        1.5.2.4

        <title>

        NP

        M

        1.5.2.5

        <item>

        NP

        M

        1.5.2.5.1

        identifier

        NP

        M

        1.5.2.5.2

        identifierref

        NP

        O

        1.5.2.5.3

        <title>

        NP

        M

        1.5.2.5.4

        isvisible

        NP

        O

        1.5.2.5.5

        parameters

        NP

        O

        1.5.2.5.6

        <item>

        NP

        O

        1.5.2.5.7

        <metadata>

        NP

        O

        1.5.2.5.7.1

        {Meta-data}

        NP

        O


        1.5.2.5.8

        <adlcp:timeLimitAction>

        NP

        O

        1.5.2.5.9

        <adlcp:dataFromLMS>

        NP

        O

        1.5.2.5.10

        <adlcp:completionThreshold>

        NP

        O

        1.5.2.5.11

        <imsss:sequencing>

        NP

        O

        1.5.2.5.12

        <adlnav:presentation>

        NP

        O

        1.5.2.6

        <metadata>

        NP

        O

        1.5.2.6.1

        {Meta-data}

        NP

        O

        1.5.2.7

        <imsss:sequencing>

        NP

        O

        1.6

        <resources>

        M

        M

        1.6.1

        xml:base

        O

        O

        1.6.2

        <resource>

        O

        O

        1.6.2.1

        identifier

        M

        M

        1.6.2.2

        type

        M

        M

        1.6.2.3

        href

        O

        O

        1.6.2.4

        adlcp:scormType

        M

        M

        1.6.2.5

        xml:base

        O

        O

        1.6.2.6

        <metadata>

        O

        O

        1.6.2.6.1

        {Meta-data}

        O

        O

        1.6.2.7

        <file>

        O

        O

        1.6.2.7.1

        href

        M

        M

        1.6.2.7.2

        <metadata>

        O

        O

        1.6.2.7.2.1

        {Meta-data}

        O

        O

        1.6.2.8

        <dependency>

        O

        O

        1.6.2.8.1

        identifierref

        M

        M

        1.7

        <manifest>

        O

        O

        1.8

        <imsss:sequencingCollection>

        NP

        O


    2. Error in Pseudo-Code Limit Conditions Check Process

      This addendum addresses an error in the SCORM 2004 SN Version 1.3.1 pseudo code, Line 2 of the Limit Conditions Check Process (UP.1).


      1. Rationale For Change

        The evaluation of limit conditions is to prevent unintended attempts on activities from beginning. Limit conditions do not have any affects on activities while they are active or suspended – as described in the comment to Line 2 of UP.1. The current condition evaluated on Line 2 of UP.1 does not fully enforce the criteria for evaluating limit conditions.

        Line 2 of the Limit Conditions Check Process (UP.1) should read:

        “If the Activity is Active for the activity is True Or the Activity is Suspended for the activity is True Then”


      2. SCORM Update

        The correct language will be added to Line 2 of the Limit Conditions Check Process (UP.1).

        The pseudo code will be updated to:


        Limit Conditions Check Process [UP.1] (for an activity; returns True if any of the activity’s limit conditions

        have been violated):

        Reference: Activity Attempt Count TM.1.2.1; Activity Progress Status TM.1.2.1; Activity Absolute Duration TM.1.2.1; Activity Experienced Duration TM.1.2.1; Attempt Progress Status TM.1.2.2; Attempt Absolute Duration TM.1.2.2; Attempt Experienced Duration TM.1.2.2; Limit Condition Activity Absolute Duration Control SM.3; Limit Condition Activity Absolute Duration Limit SM.3; Limit Condition Activity Experienced Duration Control SM.3; Limit Condition Activity Experienced Duration Limit SM.3; Limit Condition Attempt Absolute Duration Control SM.3; Limit Condition Attempt Absolute Duration Limit SM.3; Limit Condition Attempt Experienced Duration Control SM.3; Limit Condition Attempt Experienced Duration Limit SM.3; Limit Condition Attempt Control SM.3; Limit Condition Attempt Limit SM.3; Limit

        Condition Begin Time Limit SM.3; Limit Condition Begin Time Limit Control SM.3; Limit Condition End Time Limit SM.3; Limit Condition End Time Limit Control SM.3; Tracked SM.11

        1.

        If Tracked for the activity is False Then

        If the activity is not tracked, its limit

        conditions cannot be violated

        1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        False)

        Activity is not tracked, no limit

        conditions can be violated


        End If



        2.

        If the Activity is Active for the activity is True Or the Activity is Suspended

        for the activity is True Then

        Only need to check activities that will

        begin a new attempt

        2.1

        Exit Limit Conditions Check Process (Limit Condition Violated:

        False)



        End If


        3.

        If the Limit Condition Attempt Control for the activity is True Then


        3.1.

        If the Activity Progress Status for the activity is True And the Activity Attempt Count for the activity is greater than or equal (>=) to the Limit

        Condition Attempt Limit for the activity Then


        3.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        4.

        If the Limit Condition Activity Absolute Duration Control for the activity is

        True Then


        4.1.

        If the Activity Progress Status for the activity is True And the Activity Absolute Duration for the activity is greater than or equal (>=) to Limit

        Condition Activity Absolute Duration Limit for the activity Then


        4.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        5.

        If the Limit Condition Activity Experienced Duration Control for the

        activity is True Then


        5.1.

        If the Activity Progress Status for the activity is True And the Activity Experienced Duration for the activity is greater than or equal (>=) to the Limit Condition Activity Experienced Duration Limit for the activity

        Then


        5.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        6.

        If the Limit Condition Attempt Absolute Duration Control for the activity is

        True Then


        6.1.

        If the Activity Progress Status for the activity is True And the Attempt Progress Status for the activity is True And the Attempt Absolute Duration for the activity is greater than or equal (>=) to the Limit

        Condition Attempt Absolute Duration Limit for the activity Then


        6.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        7.

        If the Limit Condition Attempt Experienced Duration Control for the

        activity is True Then


        7.1.

        If the Activity Progress Status for the activity is True And the Attempt Progress Status for the activity is True And the Attempt Experienced

        Duration for the activity is greater than or equal (>=) to the Limit Condition Attempt Experienced Duration Limit for the activity Then


        7.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If



        8.

        If the Limit Condition Begin Time Limit Control for the activity is True

        Then


        8.1.

        If the current time point is before the Limit Condition Begin Time Limit

        for the activity Then


        8.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        9.

        If the Limit Condition End Time Limit Control for the activity is True Then


        9.1.

        If the current time point is after the Limit Condition End Time Limit for

        the activity Then


        9.1.1.

        Exit Limit Conditions Check Process (Limit Condition Violated:

        True)

        Limit conditions

        have been violated


        End If



        End If


        10..

        Exit Limit Conditions Check Process (Limit Condition Violated: False)

        No limit conditions

        have been violated

        pseudo code for limit conditions check process


    3. Error in Pseudo-Code Choice Flow Tree Traversal Sub-process

      This addendum addresses an error in the SCORM 2004 SN Version 1.3.1 pseudo code, Line 2.1.1 of the Choice Flow Tree Traversal Sub-process (SB.2.9.2).


      1. Rationale For Change

        The Choice Flow Tree Traversal Sub-process (SB.2.9.2), Line 2.1.1 is missing some text. (Next Activity) should be changed to (Next Activity: Nil).


      2. SCORM Update

        (Next Activity) will be changed to (Next Activity: Nil) as follows:


        Choice Flow Tree Traversal Subprocess [SB.2.9.2] (for an activity, a traversal direction; returns the ‘next’

        activity in directed traversal of the activity tree):

        Reference: Available Children AM.1.1

        1.

        If the traversal direction is Forward Then


        1.1.

        If the activity is the last activity in a forward preorder tree traversal of

        the activity tree Then

        Cannot walk off

        the activity tree

        1.1.1.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: Nil)



        End If


        1.2.

        If the activity is the last activity in the activity’s parent’s list of

        Available Children Then


        1.2.1.

        Apply the Choice Flow Tree Traversal Subprocess to the activity’s parent in the Forward direction

        Recursion - Move to the activity’s parent’s next

        forward sibling

        1.2.2.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: the

        results of the recursive Choice Flow Tree Traversal Subprocess)

        Return the result of

        the recursion

        1.3.

        Else


        1.3.1.

        Traverse the tree, forward preorder, one activity to the next

        activity, in the activity’s parent’s list of Available Children


        1.3.2.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: the

        activity identified by the traversal)



        End If



        End If


        2.

        If the traversal direction is Backward Then


        2.1.

        If the activity is the root activity of the tree Then

        Cannot walk off the root of the

        activity tree

        2.1.1.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: Nil)



        End If


        2.2.

        If the activity is the first activity in the activity’s parent’s list of

        Available Children Then


        2.2.1.

        Apply the Choice Flow Tree Traversal Subprocess to the

        Recursion – Move



        activity’s parent in the Backward direction

        to the activity’s parent’s next

        backward sibling

        2.2.1.1.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: the

        results of the recursive Choice Flow Tree Traversal Subprocess)

        Return the result of

        the recursion

        2.3.

        Else


        2.3.1.

        Traverse the tree, reverse preorder, one activity to the previous

        activity, from the activity’s parent’s list of Available Children


        2.3.2.

        Exit Choice Flow Tree Traversal Subprocess (Next Activity: the

        activity identified by the traversal)



        End If



        End If


        pseudo code for choice flow tree traversal subprocess


    4. Error in Pseudo-Code Previous Sequencing Request Process

      This addendum addresses an error in the SCORM 2004 SN Version 1.3.1 pseudo code, Line 2.1 of the Previous Sequencing Request Process (SB.2.8).


      1. Rationale For Change

        The Previous Sequencing Request Process (SB.2.8), Line 2.1 is missing the conditional value of “False”.


      2. SCORM Update

        The Previous Sequencing Request Process will be updated as follows:


        Previous Sequencing Request Process [SB.2.8] (may return a delivery request; may return an exception

        code):

        Reference: Current Activity AM.1.2; Flow Subprocess SB.2.3

        1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session has

        already begun

        1.1.

        Exit Previous Sequencing Request Process (Delivery Request: n/a;

        Exception: SB.2.8-1 )

        Nothing to deliver


        End If


        2.

        If the activity is not the root activity of the activity tree Then


        2.1.

        If Sequencing Control Flow for the parent of the activity is False Then

        Confirm a ‘flow’

        traversal is allowed from the activity

        2.1.1.

        Exit Flow Tree Traversal Subprocess (Next Activity: Nil;

        Exception: SB.2.8-2 )



        End If



        End If


        3.

        Apply the Flow Subprocess to the Current Activity in the Backward

        direction with consider children equal to False

        Flow in a backward direction to the next allowed

        activity

        4.

        If the Flow Subprocess returns False Then


        4.1.

        Exit Previous Sequencing Request Process (Delivery Request: n/a;

        Exception: the exception identified by the Flow Subprocess)

        Nothing to deliver

        5.

        Else


        5.1.

        Exit Previous Sequencing Request Process (Delivery Request: the

        activity identified by the Flow Subprocess; Exception: n/a )



        End If


        pseudo code for previous sequencing request process


    5. Application of Measure Satisfaction if Active Behavior

      This addendum addresses inconsistency in the application of the ADL extension attribute

      measureSatisfactionIfActive, as defined in the SCORM 2004 SN Version 1.3.1.


      1. Rationale For Change

        Two behavioral extensions (fixes) to IMS SS were put into the SCORM SN with regard to measure rollup. First, a cluster will always have a measure if any of its children have a defined measure. Second, since the rolled-up measure may not include sufficient information (some child activities may have not been attempted), a measure threshold evaluation (Satisfied by Measure) may prematurely affect the satisfaction status of the activity. To prevent a measure threshold evaluation from prematurely affecting an activity’s satisfaction status, an ADL namespace element, measureSatisfactionIfActive was added. This attribute indicates when the measure threshold evaluation should affect an activity’s satisfaction status – either during the current attempt on the activity or not until the current attempt on the activity ends (the activity becomes “inactive”). Enforcement of these behaviors was put directly into the normative Sequencing Behavior Pseudo Code (Appendix C).

        Language was added to the SCORM SN (Section 4.2.1.7: Tracking Behavior, page SN-4- 18) to ensure consistent evaluation of a shared global objective status. More specifically, clause #5 states that threshold evaluations will be performed any time the local status of activity is unknown and a read Objective Map is defined. As written, this behavior will circumvent the pseudo code’s application of the ADL namespace element, measureSatisfactionIfActive.


      2. SCORM Update

        Section 3.9.1: Measure Satisfaction If Active (SN-3-35) will be updated as follows: From:

        The Measure Satisfaction If Active element indicates when an activity’s rolled-up objective measure will be applied to the rolled-up objective satisfaction. This element is applied during the Objective Rollup Using Measure Process (refer to Appendix C). This element contains a boolean (True/False) value. The default value for Measure Satisfaction If Active, if not defined explicitly for the activity, is True.


If the Measure Satisfaction If Active element is defined as False, the LMS will only apply the Objective Minimum Satisfied Normalized Measure to the activity’s rolled-up objective when the attempt on the activity ends.

To:


Evaluation of a defined measure threshold (Objective Satisfied by Measure) is conditional. The Measure Satisfaction If Active element indicates when an activity’s rolled-up objective measure will be applied to the activity’s rolled-up objective satisfaction. This element is applied whenever the activity’s satisfaction status is required and that status is determined through a measure threshold evaluation (Objective Satisfied by Measure). This element contains a boolean (True/False) value. The default value for Measure Satisfaction If Active, if not defined explicitly for the activity, is True.

If the Measure Satisfaction If Active element is defined as False, the LMS will only apply the Objective Minimum Satisfied Normalized Measure to the activity’s rolled-up objective when the attempt on the activity ends and the activity becomes inactive. Until that time the satisfaction status of the activity’s rolled-up objective shall be considered “unknown”.


And on page SN-3-36: From:

In contrast, if the Measure Satisfaction If Active element is False, the satisfaction of Module AA’s objective will not be evaluated until Module AA is explicitly exited – it will remain “unknown”. Module AA can only be explicitly exited by a Sequencing Exit action rule applied to Module A evaluating to true.

To:


In contrast, if the Measure Satisfaction If Active element is False, the satisfaction of Module AA’s rolled-up (primary) objective will not be evaluated until Module AA becomes inactive – it will remain “unknown”. One way for Module AA to become inactive is for it to be explicitly exited by a Sequencing Exit action rule applied to Module AA evaluating to true.


In Section 4.2.1.7: Tracking Behavior, clause #5 (SN-4-18) will be updated as follows: From:

ADL Note: In this case, an LMS may store the evaluated Objective Satisfied Status in the activity’s local Objective Progress Information. Doing so should not alter the local Objective Measure.

To:


ADL Note: Evaluation of a defined measure threshold (Objective Satisfied by Measure) is conditional on the state of the activity and the value of its Measure Satisfaction If Active element. If the activity is active and has Measure Satisfaction If Active is equal to false, no measure threshold evaluation shall be performed – the satisfaction status of the activity shall be considered “unknown”.

When this evaluation is performed, an LMS may store the evaluated Objective Satisfied Status in the activity’s local Objective Progress Information. Doing so should not alter the local Objective Measure.


    1. Initialization of a SCO’s Objectives from Sequencing Information

      This addendum addresses the incomplete definition of required LMS behavior concerning initialization and updates to a SCO’s objectives collection (cmi.objectives) using sequencing information applied to the SCO’s associated activity, as defined in the SCORM 2004 RTE Version 1.3.1.


      1. Rationale For Change

        Each SCO’s Run-Time Data includes a collection of objectives – cmi.objectives. Each activity may have zero or more objectives defined in its sequencing information.

        The SCORM 2004 RTE Version 1.3.1 intends for SCOs to have some access to the state of its associated activity’s objectives based on sequencing Tracking Information available at the time the SCO is launched. Although the SCORM 2004 RTE Version 1.3.1 describes this behavior, the information is spread across several sections of the document and that information does not clearly describe what should happen when a Learner Attempt on a SCO suspends and later resumes.


      2. SCORM Update

        The description of initializing Run-Time Data Model objectives, Section 4.2.17.2: Utilizing Objective Status for Sequencing (RTE-4-96), will be updated as follows:

        Utilizing Objective Status for Sequencing

        Instructional designers may wish to use objectives to make conditional sequencing decisions; this desire is explicitly represented in the sequencing information associated with a learning activity (refer to the SCORM CAM book). As a SCO references objectives through their identifiers, so does the sequencing information associated with a learning activity. SCORM defines how identifiers are used to relate the objectives defined on the learning activity for sequencing purposes with the objectives (cmi.objectives) available to a SCO during the learning experience.

        For objectives associated with a learning activity, those that may be affected by the learning experience are those with identifiers that match identically with an identifier defined in the Objectives RTE Data Model element for the SCO associated with that learning activity. When a SCO is launched for a new learner attempt, the LMS will initialize a set of run-time objectives (cmi.objectives.n.xxx) for the SCO with the objective status information

        From:




        managed for sequencing the SCO’s associated learning activity. During the learner experience, the SCO may modify the status of these sets of objective status information; the updated status information will be used by the LMS during sequencing evaluations.

        To:


        Initialization of Run-Time Objectives from Sequencing Information

        Instructional designers may wish to use objectives to make conditional sequencing decisions; this desire is explicitly represented in the sequencing information associated with a learning activity (refer to the SCORM CAM book). As a SCO references objectives through their identifiers, so does the sequencing information associated with a learning activity. For objectives associated with a learning activity, those that may be affected by the learning experience are those with identifiers that match identically with an identifier defined in the cmi.objectives collection for the SCO associated with that learning activity.

        SCORM defines how identifiers are used to relate the objectives defined on the learning activity for sequencing purposes to the objectives collection (cmi.objectives) available to the activity’s associated SCO during the learning experience. Whenever a SCO is launched for a new learner attempt, the LMS shall initialize a set of run-time objectives (cmi.objectives) for the SCO with the objective status information managed for sequencing the SCO’s associated learning activity. The LMS shall create one entry in the SCO’s objectives collection for each objective defined in the sequencing information (children of the <imsss:objectives> element) applied to the SCO’s associated activity. The sequencing information shall be used to initialize the run-time objective as follows:

        1. cmi.objectives.n.id shall be initialized with the objective’s ID (the objective ID attribute associated to the objective in the activity’s sequencing information.)

        2. cmi.objectives.n.success_status shall be initialized with the Tracking Information associated with the objective (possibly through a read Objective Map).

        3. cmi.objectives.n.score.scaled shall be initialized with the Tracking Information associated with the objective (possibly through a read Objective Map).

        When the new learner attempt on the SCO begins and after LMS initialization of the SCO’ objective collection, the number of objectives contained in its objective collection (cmi.objectives._count) shall equal the number of objectives defined in the sequencing information (children of the <imsss:objectives> element) applied to the SCO’s associated activity that have defined Objective IDs. During the learner experience, the SCO may modify the status of these objectives;



        the updated status information will be used by the LMS during sequencing evaluations.

        ADL Note: If a SCO alters an objective ID (cmi.objectives.id), the association between the run-time objective and the associated activity’s objective will be broken. The LMS will not know how to map the objective’s run-time status to the sequencing Tracking Information.

        ADL Note: If a learner attempt on a SCO is suspended and then later resumed, the LMS is not required to update the SCO’s objectives collection to reflect changes in sequencing Tracking Information occurring with any of the SCO’s associated activity’s objectives while the SCO is suspended.

        The LMS Behavior Requirements defined for cmi.objectives.n.id, (RTE-4-98), will be updated as follows:

        From:


        If the <imsss:objectives> are defined for an <imscp:item> element in the Content Package Manifest, then the LMS is responsible for initializing objective run-time data (cmi.objectives.n.xxx) for the SCO based on the Objective Progress Information referenced and managed by the learning activity. Run-time data related to objectives (cmi.objectives.n.xxx) should not be initialized for an activity’s associated SCO unless an objective ID attribute is defined in the sequencing information (<imsss:primaryObjective> or <imsss:objective>). The objective ID attribute shall be used to initialize the cmi.objectives.n.id value. The number of objectives defined in the manifest dictates the number of objective status information that need to be initialized. The LMS is also responsible for initializing status and score for the objective information data if that information is available to the LMS (refer to the SCORM SN book – Global objectives).

To:


If the <imsss:objectives> are defined for an <imscp:item> element in the Content Package Manifest, then the LMS is responsible for initializing objective run-time data (cmi.objectives.n.xxx) for the SCO based on the Objective Progress Information referenced and managed for the learning activity. Run-time data related to objectives (cmi.objectives.n.xxx) should not be initialized for an activity’s associated SCO unless an objective ID attribute is defined in the sequencing information (<imsss:primaryObjective> or <imsss:objective>). The objective ID attribute shall be used to initialize the cmi.objectives.n.id value.


    1. Variable Error in Measure Rollup Process (RB.1.1)

      This addendum addresses an error in the variables in the Measure Rollup Process (RB.1.1), as defined in the SCORM 2004 SN Version 1.3.1.


      1. Rationale For Change

        Lines 5.2 and 5.3 of the Measure Rollup Process (RB.1.1) refer to the wrong variable.

        The intention of the Measure Rollup Process is to compute the average weighted measure of all the measures applied to an activity’s children. This process should only provide a rolled-up measure if there is AT LEAST ONE child that contributes a known measure to its parent; otherwise there is insufficient information available to compute any value and the rolled-up (parent’s) measure should be considered “unknown.” This intended behavior is described in the comment on line 5.2 from the IMS SS Specification.

        The wrong variable (“counted measures” instead of “total weighted measure”) is used on lines 5.2 and 5.3. These lines were correct in the IMS SS Version 1.0 of the p-code because the IMS measure rollup process from that version would only result in a known rolled-up measure if ALL children contributed a known measure to its parent. If any child did not have a known measure, “counted measures” would b set to 0.0 – in this case it was sufficient to look at just the “counted measures” to evaluate clauses 5.2 and 5.3.

        However, SCORM Sequencing altered the Measure Rollup Process to ensure that if ANY child had a known measure, then its parent would have a known measure. This extension resulted in a change to the IMS SS pseudo code and makes the clauses on lines 5.2 and

        5.3 insufficient. The result of using the “counted measures” in these two lines is that the “number of children” (counted measures) is used as the criteria for determining if a rolled-up measure should be evaluated instead of the existence of a known measure on one of the children. In other words, based on the current SCORM Sequencing pseudo code, if a cluster has ANY child that is tracked and has a non-zero measure weight, then the “countered measures” will be non-zero (ignoring clause 5.2) and the cluster will have known measure of 0.0 (from line 5.3.2).

        To illustrate the problem with an example: assume that Activity A has 3 children, A1, A2, and A3 that each have the default measure weight (1.0) and no defined measure (measure is “unknown”) for their primary (rolled-up) objective. If the Measure Rollup Process is applied to A, the process will calculate 3 for “counted measure” (on line 5.1.1.3.1) but will not increment “total weighted measure”. Line 5.3 would cause the activity to have a rolled-up measure of 0.0 (0.0 / 3.0).

      2. SCORM Update

        RB.1.1 will be updated to add a new line 2 (shift all other lines down 1): Set valid data to False

        RB.1.1 will be updated to add a new line 5.1.1.3.2.2 (line number prior to renumbering): Set valid data to True

        RB.1.1 line 5.2 will be updated to read:

        If valid data is False Then

        In RB.1.1, the current line 5.2.2 will be deleted and the line End If that immediately follows 5.2.2 will be removed. The current line 5.3 will be updated to read:

        Else

        RB.1.1 will be updated by swapping lines 5.3.3 and the End If line that immediately follows it.

        From:


        Measure Rollup Process [RB.1.1] (for an activity; may change the Objective Information for the activity):

        Reference: Objective Contributes to Rollup SM.6; Objective Description SM.6; Objective Measure Status

        TM.1.1; Objective Normalized Measure TM.1.1; Rollup Objective Measure Weight SM.8; Tracked SM.11

        1.

        Set the total weighted measure to Zero (0.0)


        2.

        Set the counted measures to Zero (0.0)


        3.

        Set the target objective to Undefined


        4.

        For each objective associated with the activity


        4.1.

        If Objective Contributes to Rollup for the objective is True Then

        Find the target

        objective for the rolled-up measure

        4.1.1.

        Set the target objective to the objective


        4.1.2.

        Break For



        End If



        End For


        5.

        If target objective is Defined Then


        5.1.

        For each child of the activity


        5.1.1.

        If Tracked for the child is True Then

        Only include

        tracked children

        5.1.1.1.

        Set rolled-up objective to Undefined


        5.1.1.2.

        For each objective associated with the child


        5.1.1.2.1.

        If Objective Contributes to Rollup for the objective is

        True Then


        5.1.1.2.1.1.

        Set rolled-up objective to the objective


        5.1.1.2.1.2.

        Break For



        End If



        End For


        5.1.1.3.

        If rolled-up objective is Defined Then


        5.1.1.3.1.

        Increment counted measures by the Rollup Objective

        Measure Weight for the child


        5.1.1.3.2.

        If the Objective Measure Status for the rolled-up




        objective is True Then


        5.1.1.3.2.1.

        Add the product of Objective Normalized Measure for the rolled-up objective multiplied by the Rollup Objective Measure Weight for the child to the total

        weighted measure



        End If


        5.1.1.4.

        Else


        5.1.1.4.1.

        Exit Measure Rollup Process

        One of the children

        does not include a rolled-up objective


        End If



        End If



        End For


        5.2.

        If counted measures is Zero (0.0) Then


        5.2.1.

        Set the Objective Measure Status for the target objective to False

        No tracking state rolled-up, cannot

        determine the rolled-up measure

        5.2.2.

        Exit Measure Rollup Process



        End If


        5.3.

        If counted measures is greater than (>) Zero (0.0) Then

        Set the rolled-up measure for the

        target objective

        5.3.1.

        Set the Objective Measure Status for the target objective to True


        5.3.2.

        Set the Objective Normalized Measure for the target objective to

        the total weighted measure divided by counted measures


        5.3.3.

        Exit Measure Rollup Process



        End If



        End If


        6.

        Exit Measure Rollup Process

        No objective contributes to rollup, so we

        cannot set anything

        pseudo code for measure rollup process


        To:


        Measure Rollup Process [RB.1.1] (for an activity; may change the Objective Information for the activity):

        Reference: Objective Contributes to Rollup SM.6; Objective Description SM.6; Objective Measure Status

        TM.1.1; Objective Normalized Measure TM.1.1; Rollup Objective Measure Weight SM.8; Tracked SM.11

        1.

        Set the total weighted measure to Zero (0.0)


        2.

        Set valid data to False


        3.

        Set the counted measures to Zero (0.0)


        4.

        Set the target objective to Undefined


        5.

        For each objective associated with the activity


        5.1.

        If Objective Contributes to Rollup for the objective is True Then

        Find the target

        objective for the rolled-up measure

        5.1.1.

        Set the target objective to the objective


        5.1.2.

        Break For



        End If



        End For


        6.

        If target objective is Defined Then



        6.1.

        For each child of the activity


        6.1.1.

        If Tracked for the child is True Then

        Only include

        tracked children

        6.1.1.1.

        Set rolled-up objective to Undefined


        6.1.1.2.

        For each objective associated with the child


        6.1.1.2.1.

        If Objective Contributes to Rollup for the objective is

        True Then


        6.1.1.2.1.1.

        Set rolled-up objective to the objective


        6.1.1.2.1.2.

        Break For



        End If



        End For


        6.1.1.3.

        If rolled-up objective is Defined Then


        6.1.1.3.1.

        Increment counted measures by the Rollup Objective

        Measure Weight for the child


        6.1.1.3.2.

        If the Objective Measure Status for the rolled-up

        objective is True Then


        6.1.1.3.2.1.

        Add the product of Objective Normalized Measure

        for the rolled-up objective multiplied by the Rollup Objective Measure Weight for the child to the total weighted measure


        6.1.1.3.2.2

        Set valid data to True



        End If


        6.1.1.4.

        Else


        6.1.1.4.1.

        Exit Measure Rollup Process

        One of the children does not include a

        rolled-up objective


        End If



        End If



        End For


        6.2.

        If valid data is False Then


        6.2.1.

        Set the Objective Measure Status for the target objective to False

        No tracking state rolled-up, cannot

        determine the rolled-up measure

        6.3.

        If counted measures is greater than (>) Zero (0.0) Then

        Set the rolled-up measure for the

        target objective

        6.3.1.

        Set the Objective Measure Status for the target objective to True


        6.3.2.

        Set the Objective Normalized Measure for the target objective to

        the total weighted measure divided by counted measures



        End If


        6.3.3.

        Exit Measure Rollup Process



        End If


        7.

        Exit Measure Rollup Process

        No objective contributes to

        rollup, so we cannot set anything

        pseudo code for measure rollup process


    2. Incorrect Definition of Extended Rollup Set

      This addendum addresses an incorrect definition of the “rollup set” in the Extended Rollup Process, as defined in the SCORM 2004 SN Version 1.3.1.


      1. Rationale For Change

        The Extended Rollup Process (described in the SCORM 2004 SN Version 1.3.1 on page SN-4-34, Rule A) incorrectly defines the “rollup set” – too many activities are included. Adhering strictly with the language of the SCORM 2004 SN Version 1.3.1, LMS sequencing implementers would fail at least one of the test cases defined in the SCORM 2004 Conformance Requirements Version 1.2.

        The purpose of the Extended Rollup Process is to propagate status information, made available through shared global objectives, throughout the entire Activity Tree. The Overall Rollup Process (RB.1.5) does not need to be, and should not be, applied directly to an activity that shares global state- (through a “read” map) with some other activity (through a “write” map). In these cases, the current and most valid state has already communicated directly through the shared global objective to the activity that shares state. Applying the Overall Rollup Process to this activity would, in most cases, overwrite that shared state and defeat intent of the Extended Rollup Process.


      2. SCORM Update

        In the SCORM 2004 SN Version 1.3.1 (page SN-4-34) Rule A will be updated as follows:

        From:


        Determine all activities that are affected by the change of status. This includes the Current Activity and any activity (read Objective Map) that shares a global objective with the Current Activity (write Objective Map) – this is the “rollup set”.

To:


Determine all activities that are affected by the change of status. This includes the Current Activity and the parent of any activity (read Objective Map) that shares a global objective with the Current Activity (write Objective Map) – this is the “rollup set”.


    1. Portability (Interoperability) of URLs between Windows and UNIX Systems

      This addendum addresses an issue that affects portability (interoperability) of Universal Resource Locators (URLs) between Windows and UNIX systems, specifically related to the use of the backward slash (“\”) character.


      1. Rationale For Change

        RFC 2396 allows backward slashes in URLs, but specifies that it is unwise to use them. The RFC does not specify the semantics of the character; however, in URLs for content that may be put on any Web server regardless of implementation technology, and also particular for xml:base, the character has specific semantics that affect interoperability, and only the interoperable form should be allowed. Currently, SCORM does not define any requirements and guidance in using the backward slash (“\”) or slash (“/”) in URLs.


      2. SCORM Update

        The SCORM 2004 CAM Version 1.3.1 will be updated to describe how URLs should be represented. A new section, Section 3.4.4.4, will be added to the CAM to specify that if a backward slash ("\") is needed in a URL (href or xml:base attributes) then the backward slash shall be properly escaped. The section will also define that for those URLs that are hierarchical then the slash (“/”) character shall be used to separate the hierarchical components (e.g., used to construct a file name hierarchy).

        For example: <resource href=”lesson/module/topic1/sco1.htm”>


    2. The <adlnav:presentation> Element Should be Permitted on an Asset Resource


      This addendum addresses the need to permit the <adlnav:presentation> element on an Asset Resource.


      1. Rationale For Change

        SCORM 2004 currently prohibits the <adlnav:presentation> element from being a direct-descendant of an <item> element that references an Asset Resource. The

        <adlnav:presentation> element is only allowed on an <item> element that references a SCO Resource. In some cases, content developers may want to force a learner to choose an activity from a menu or table of contents while the learner is experiencing an Asset Resource. If this learning strategy is required, then the content designer may want to inform the LMS to hide any user interface controls that might indicate to the learner to flow (i.e., “continue” or “previous” buttons). This strategy will force the learner to choose an item from a menu or table of contents.

        If the content developer wants to indicate to the LMS to hide the user interface controls provided by the LMS, then this information must be defined on the <item> element. To do this, the content developer must place the <adlnav:presentation> (and the appropriate descendants of this element) as a direct-descendant of the <item> in question.

        The change is being made to permit the learning strategy described above. This change will permit the use of the <adlnav:presentation> element as a direct-descendant of any <item> element that references a resource.


      2. SCORM Update

        Section 5.2.1.1: <presentation> Element will be updated as follows: From:

        The <presentation> element is a container element that encapsulates presentation information for a given learning activity. This element is an ADL- defined extension to the IMS Content Packaging Specification. The element shall only appear, if needed, as a child of a leaf <item> element that references a SCO. Only those <item> elements that reference a SCO resource can contain the

        <presentation> element.

To:


The <presentation> element is a container element that encapsulates presentation information for a given learning activity. This element is an ADL- defined extension to the IMS Content Packaging Specification. The element shall only appear, if needed, as a child of a leaf <item> element that references a resource.


    1. Default Value for timeinterval(second,10,2) Should be any Value that Evaluates to Zero

      This addendum addresses an issue with the default value for the SCORM 2004 RTE Data Model element cmi.total_time.


      1. Rationale For Change

        The SCORM 2004 RTE Version 1.3.1 defines the default value for the cmi.total_time data model element as PT0H0M0S. This default value evaluates to a total time of zero. This default value is too restrictive and will be updated to permit any value that evaluates to a total time of zero. This will permit an LMS to initialize this value to zero and not require the value to be represented in particular format. For example PT0M (i.e., a period of time of zero minutes) is semantically equivalent to PT0H0M0S (i.e., a period of time of zero hours, zero minutes and zero seconds).

        How this value is syntactically represented is not important. The important fact is that the value evaluates to an interval of time of zero.


      2. SCORM Update

        Table 4.2.25a: Dot-notation Binding for the Total Time Data Model Element will be updated:

        From:


        LMS Behavior Requirements:

        • The data model element is mandatory and shall be implemented by the LMS as read-only.

        • Since this data model element is implemented by the LMS as read-only, it is the responsibility of the LMS to manage this data. Since this value is the accumulated session times (cmi.session_time), the LMS cannot determine this value until the SCO sets session times. If the SCO requests the value before any session times have been set, then the LMS shall behave according to the API Implementation Requirements behaviors defined below.

        • The value of the cmi.total_time shall not be updated by the LMS while a learner session is in progress.

        • The default value for the cmi.total_time shall be PT0H0M0S.

LMS Behavior Requirements:

To:



    1. Exit Action Rule on the Activity Tree Root does not End the Sequencing Session

      In the SCORM 2004 SN Version 1.3.1, if a Sequencing Exit Action Rule successfully evaluates on the root of the Activity Tree and either a Sequencing Post Condition Rule or a (user initiated) sequencing request of Continue or Previous is pending, that request would be incorrectly processed and result in an uncaught exception in the sequencing pseudo code.


      1. Rationale For Change

        In the case where root of the Activity Tree “exits”, the pending (Continue or Previous) Sequencing Request Process would attempt to look at the "parent of the current activity". Since the root does not have a parent, this results in the uncaught exception, as defined in the pseudo code..

        If the root of the Activity Tree exits due to an Exit Action Rule, only a "retry" Post Condition rule makes sense – a “retry” means that a new attempt on the root (and hence the entire Activity Tree) should begin. Otherwise, exiting the root should mean that the sequencing session has ended and control be given back to the LMS.


      2. SCORM Update

        The SCORM 2004 SN Version 1.3.1 will be updated to ensure that the current sequencing session ends if the root of the activity tree is exited without a corresponding "retry" Post Condition Rule. This will be accomplished by updating the Termination Request Process (TB.2.3) found in Appendix C: Sequencing Behavior Pseudo Code of the SCORM 2004 SN Version 1.3.1.

        The Termination Request Process (TB.2.3) will be updated: From:

        Termination Request Process [TB.2.3] (for a termination request, ends the current attempt on the Current

        Activity; returns the validity of the termination request; may return a sequencing request; may return an exception code):

        Reference: Activity is Active AM.1.1; Activity is Suspended AM.1.1; Current Activity AM.1.2; End Attempt Process UP.4; Sequencing Exit Action Rules Subprocess TB.2.1; Sequencing Post Condition Rules

        Subprocess TB.2.2; Terminate Descendent Attempts Process UP.3

        1.

        If the Current Activity is Not Defined Then

        If the sequencing session has not begun, there is nothing to

        terminate

        1.1.

        Exit Termination Request Process (Termination Request: Not Valid;




        Sequencing Request: n/a; Exception: TB.2.3-1)



        End If


        2.

        If (the termination request is Exit Or Abandon) And Activity is Active for the Current Activity is False Then

        If the current activity has already been terminated,

        there is nothing to terminate

        2.1.

        Exit Termination Request Process (Termination Request: Not Valid;

        Sequencing Request: n/a; Exception: TB.2.3-2)



        End If


        3.

        Case: termination request is Exit


        3.1.

        Apply the End Attempt Process to the Current Activity

        Ensure the state of the current activity

        is up to date

        3.2.

        Apply the Sequencing Exit Action Rules Subprocess to the Current Activity

        Check if any of the current activity’s

        ancestors need to terminate

        3.3.

        Repeat


        3.3.1.

        Set the processed exit to False


        3.3.2.

        Apply the Sequencing Post Condition Rules Subprocess to the

        Current Activity


        3.3.3.

        If the Sequencing Post Condition Rule Subprocess returned a

        termination request of Exit All Then


        3.3.3.1.

        Change the termination request to Exit All


        3.3.3.2.

        Break to the next Case

        Process an Exit All

        Termination Request


        End If


        3.3.4.

        If the Sequencing Post Condition Rule Subprocess returned a termination request of Exit Parent Then

        If we exit the parent of the current activity, move the current activity to the parent of the

        current activity.

        3.3.4.1.

        If the Current Activity is Not the root of the activity tree Then

        root of the ity tree does

        ave a parent to

        3.3.4.1.1.

        Set the Current Activity to the parent of the Current

        Activity


        3.3.4.1.2.

        Apply the End Attempt Process to the Current Activity


        3.3.4.1.3.

        Set processed exit to True

        Need to evaluate post conditions on the new current

        activity

        3.3.4.2.

        Else


        3.3.4.2.1.

        Exit Termination Request Process (Termination Request: Not Valid; Sequencing Request: n/a;

        Exception: TB.2.3-4)



        End If



        End If


        3.4.

        Until processed exit is False



        3.5.

        Exit Termination Request Process (Termination Request: Valid; Sequencing Request: is the sequencing request returned by the Sequencing Post Condition Rule Subprocess, if one exists, otherwise

        n/a; Exception: n/a)



        End Case


        4.

        Case: termination request is Exit All


        4.1.

        If Activity is Active for the Current Activity is True Then

        Has the completion subprocess and rollup been applied to the current

        activity yet?

        4.1.1.

        Apply the End Attempt Process to the Current Activity



        End If


        4.2.

        Apply the Terminate Descendent Attempts Process to the root of the

        activity tree


        4.3.

        Apply the End Attempt Process to the root of the activity tree


        4.4.

        Set the Current Activity to the root of the activity tree

        Move the current

        activity to the root of the activity tree

        4.5.

        Exit Termination Request Process (Termination Request: Valid; Sequencing Request: is the sequencing request returned by the Sequencing Post Condition Rule Subprocess, if one exists, otherwise an

        Exit sequencing request; Exception: n/a)

        Inform the sequencer that the

        sequencing session has ended


        End Case


        5.

        Case: termination request is Suspend All


        5.1.

        If (the Activity is Active for the Current Activity is True) Or (the

        Activity is Suspended for the Current Activity is True) Then

        If the current activity is active or already suspended, suspend it and all

        of its descendents

        5.1.1.

        Set the Suspended Activity to the Current Activity


        5.2.

        Else


        5.2.1.

        If the Current Activity is not the root of the activity tree Then

        Make sure the current activity is not the root of the

        activity tree

        5.2.1.1.

        Set the Suspended Activity to the parent of the Current Activity


        5.2.2.

        Else


        5.2.2.1.

        Exit Termination Request Process (Termination Request:

        Not Valid; Sequencing Request: n/a; Exception: TB.2.3-3)

        Nothing to suspend


        End If



        End If


        5.3.

        Form the activity path as the ordered series of all activities from the

        Suspended Activity to the root of the activity tree, inclusive


        5.4.

        If the activity path is Empty Then


        5.4.1.

        Exit Termination Request Process (Termination Request: Not

        Valid; Sequencing Request: n/a; Exception: TB.2.3-5)

        Nothing to suspend


        End If


        5.5.

        For each activity in the activity path


        5.5.1.

        Set Activity is Active for the activity to False


        5.5.2.

        Set Activity is Suspended for the activity to True



        End For


        5.6.

        Set the Current Activity to the root of the activity tree

        Move the current

        activity to the root




        of the activity tree

        5.7.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: Exit; Exception: n/a)

        Inform the sequencer that the sequencing session

        has ended


        End Case


        6.

        Case: termination request is Abandon


        6.1.

        Set Activity is Active for the Current Activity to False


        6.2.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: n/a; Exception: n/a)



        End Case


        7.

        Case: termination request is Abandon All


        7.1.

        Form the activity path as the ordered series of all activities from the

        Current Activity to the root of the activity tree, inclusive


        7.2.

        If the activity path is Empty Then


        7.2.1.

        Exit Termination Request Process (Termination Request: Not

        Valid; Sequencing Request: n/a; Exception: TB.2.3-6)

        Nothing to

        abandon


        End If


        7.3.

        For each activity in the activity path


        7.3.1.

        Set Activity is Active for the activity to False



        End For


        7.4.

        Set the Current Activity to the root of the activity tree

        Move the current activity to the root

        of the activity tree

        7.5.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: Exit; Exception: n/a)

        Inform the sequencer that the sequencing session

        has ended


        End Case


        8.

        Exit Termination Request Process (Termination Request: Not Valid;

        Sequencing Request: n/a; Exception: TB.2.3-7)

        Undefined

        termination request

        pseudo code for termination request process


        To:


        Termination Request Process [TB.2.3] (for a termination request, ends the current attempt on the Current Activity; returns the validity of the termination request; may return a sequencing request; may return an

        exception code):

        Reference: Activity is Active AM.1.1; Activity is Suspended AM.1.1; Current Activity AM.1.2; End Attempt Process UP.4; Sequencing Exit Action Rules Subprocess TB.2.1; Sequencing Post Condition Rules

        Subprocess TB.2.2; Terminate Descendent Attempts Process UP.3

        1.

        If the Current Activity is Not Defined Then

        If the sequencing session has not begun, there is nothing to

        terminate

        1.1.

        Exit Termination Request Process (Termination Request: Not Valid;

        Sequencing Request: n/a; Exception: TB.2.3-1)



        End If


        2.

        If (the termination request is Exit Or Abandon) And Activity is Active for the Current Activity is False Then

        If the current activity has already been terminated, there is nothing to

        terminate

        2.1.

        Exit Termination Request Process (Termination Request: Not Valid;

        Sequencing Request: n/a; Exception: TB.2.3-2)



        End If


        3.

        Case: termination request is Exit


        3.1.

        Apply the End Attempt Process to the Current Activity

        Ensure the state of the current activity

        is up to date

        3.2.

        Apply the Sequencing Exit Action Rules Subprocess to the Current Activity

        Check if any of the current activity’s

        ancestors need to terminate

        3.3.

        Repeat


        3.3.1.

        Set the processed exit to False


        3.3.2.

        Apply the Sequencing Post Condition Rules Subprocess to the

        Current Activity


        3.3.3.

        If the Sequencing Post Condition Rule Subprocess returned a

        termination request of Exit All Then


        3.3.3.1.

        Change the termination request to Exit All


        3.3.3.2.

        Break to the next Case

        Process an Exit All Termination

        Request


        End If


        3.3.4.

        If the Sequencing Post Condition Rule Subprocess returned a termination request of Exit Parent Then

        If we exit the parent of the current activity, move the current activity to the parent of the

        current activity.

        3.3.4.1.

        If the Current Activity is Not the root of the activity tree Then

        root of the ity tree does

        ave a parent to





        3.3.4.1.1.

        Set the Current Activity to the parent of the Current

        Activity


        3.3.4.1.2.

        Apply the End Attempt Process to the Current Activity


        3.3.4.1.3.

        Set processed exit to True

        Need to evaluate post conditions on the new current

        activity

        3.3.4.2.

        Else


        3.3.4.2.1.

        Exit Termination Request Process (Termination Request: Not Valid; Sequencing Request: n/a;

        Exception: TB.2.3-4)



        End If


        3.3.5.

        Else


        3.3.5.1.

        If the Current Activity is the Root of the Activity Tree And the sequencing request returned by the Sequencing Post Condition Rule Subprocess is Not Retry Then

        If the attempt on the root of the Activity Tree is ending without a Retry, the Sequencing

        Session also ends

        3.3.5.1.1.

        Exit Termination Request Process (Termination Request:

        Valid; Sequencing Request: Exit; Exception: n/a)



        End If


        3.4.

        Until processed exit is False


        3.5.

        Exit Termination Request Process (Termination Request: Valid; Sequencing Request: is the sequencing request returned by the Sequencing Post Condition Rule Subprocess, if one exists, otherwise

        n/a; Exception: n/a)



        End Case


        4.

        Case: termination request is Exit All


        4.1.

        If Activity is Active for the Current Activity is True Then

        Has the completion subprocess and rollup been applied to the current

        activity yet?

        4.1.1.

        Apply the End Attempt Process to the Current Activity



        End If


        4.2.

        Apply the Terminate Descendent Attempts Process to the root of the

        activity tree


        4.3.

        Apply the End Attempt Process to the root of the activity tree


        4.4.

        Set the Current Activity to the root of the activity tree

        Move the current

        activity to the root of the activity tree

        4.5.

        Exit Termination Request Process (Termination Request: Valid; Sequencing Request: is the sequencing request returned by the Sequencing Post Condition Rule Subprocess, if one exists, otherwise an

        Exit sequencing request; Exception: n/a)

        Inform the sequencer that the sequencing session

        has ended


        End Case


        5.

        Case: termination request is Suspend All


        5.1.

        If (the Activity is Active for the Current Activity is True) Or (the

        Activity is Suspended for the Current Activity is True) Then

        If the current activity is active or

        already suspended, suspend it and all




        of its descendents

        5.1.1.

        Set the Suspended Activity to the Current Activity


        5.2.

        Else


        5.2.1.

        If the Current Activity is not the root of the activity tree Then

        Make sure the current activity is not the root of the

        activity tree

        5.2.1.1.

        Set the Suspended Activity to the parent of the Current Activity


        5.2.2.

        Else


        5.2.2.1.

        Exit Termination Request Process (Termination Request:

        Not Valid; Sequencing Request: n/a; Exception: TB.2.3-3)

        Nothing to suspend


        End If



        End If


        5.3.

        Form the activity path as the ordered series of all activities from the

        Suspended Activity to the root of the activity tree, inclusive


        5.4.

        If the activity path is Empty Then


        5.4.1.

        Exit Termination Request Process (Termination Request: Not

        Valid; Sequencing Request: n/a; Exception: TB.2.3-5)

        Nothing to suspend


        End If


        5.5.

        For each activity in the activity path


        5.5.1.

        Set Activity is Active for the activity to False


        5.5.2.

        Set Activity is Suspended for the activity to True



        End For


        5.6.

        Set the Current Activity to the root of the activity tree

        Move the current activity to the root

        of the activity tree

        5.7.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: Exit; Exception: n/a)

        Inform the sequencer that the

        sequencing session has ended


        End Case


        6.

        Case: termination request is Abandon


        6.1.

        Set Activity is Active for the Current Activity to False


        6.2.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: n/a; Exception: n/a)



        End Case


        7.

        Case: termination request is Abandon All


        7.1.

        Form the activity path as the ordered series of all activities from the

        Current Activity to the root of the activity tree, inclusive


        7.2.

        If the activity path is Empty Then


        7.2.1.

        Exit Termination Request Process (Termination Request: Not

        Valid; Sequencing Request: n/a; Exception: TB.2.3-6)

        Nothing to

        abandon


        End If


        7.3.

        For each activity in the activity path


        7.3.1.

        Set Activity is Active for the activity to False



        End For


        7.4.

        Set the Current Activity to the root of the activity tree

        Move the current activity to the root

        of the activity tree

        7.5.

        Exit Termination Request Process (Termination Request: Valid;

        Sequencing Request: Exit; Exception: n/a)

        Inform the sequencer that the sequencing session

        has ended


        End Case



        8.

        Exit Termination Request Process (Termination Request: Not Valid;

        Sequencing Request: n/a; Exception: TB.2.3-7)

        Undefined

        termination request

        pseudo code for termination request process


    2. The Completion Status Value of “not attempted” is Not Mapped to Sequencing Tracking Information


      The SCORM 2004 RTE Data Model element cmi.completion_status, described in the SCORM 2004 RTE Version 1.3.1, allows a value of “not attempted“ to be set, but does not describe how an LMS should map this value to the SCO’s associated activity’s Sequencing Tracking Information.

      As described in the SCORM 2004 RTE Version 1.3.1, setting a SCO’s completion status to “not attempted” asserts that the learner has not attempted the SCO in any significant way, but this result is clearly distinct from “unknown”.


      1. Rationale For Change

        Since the mapping of “not attempted” to a Sequencing Tracking Information data element does not exist and this value may impact sequencing rule evaluations, the SCORM 2004 RTE Version 1.3.1 will be updated to define the mapping of the “not attempted” value to Sequencing Tracking Information.


      2. SCORM Update

        If a SCO sets cmi.completion_status to “not attempted”, the SCO’s associated Sequencing Tracking Information should be considered “incomplete”. Section 4.2.4: Completion Status will be updated to define this mapping. Specifically, Table 4.2.4a: Dot-notation Binding for the Completion Status Data Model Element will be updated as follows:

        From:


        Sequencing Impacts:

        • If the SCO or LMS (through the process described in Section 4.2.4.1) sets cmi.completion_status, of the SCO to

          “unknown”, the Attempt Progress Status for the learning activity associated with the SCO shall be false.

        • If the SCO or LMS (through the process described in Section 4.2.4.1) sets cmi.completion_status, of the SCO to “completed”, the Attempt Progress Status for the learning activity associated with the SCO shall be true, and the Attempt Completion Status for the learning activity associated with the SCO shall be true.

        • If the SCO or LMS (through the process described in Section 4.2.4.1) sets cmi.completion_status, of the SCO to “incomplete”, the Attempt Progress Status for the learning activity associated with the SCO shall be true, and the Attempt Completion Status for the learning activity associated with the SCO shall be false.

To:


LMS Behavior Requirements:



    1. Undefined Behavior for LMS Handling of Unique Identifier Collisions

      The SCORM 2004 RTE Version 1.3.1 does not clearly define how LMSs are to behave when a unique identifier collision is encountered. The Objective identifier data model element (cmi.objectives.n.id) is supposed to be unique within the scope of the SCO. If a SCO tries to set the objective identifiers as follows:

      • SetValue(“cmi.objectives.0.id”,”objective-id-1”)

      • SetValue(“cmi.objectives.1.id”,”objective-id-2”)

      • SetValue(“cmi.objectives.2.id”,”objective-id-1”)

      the last SetValue call violates the unique identifier constraint defined in SCORM 2004. The SCO tries to set new objective information (in array position 2) into the collection of objectives, but the identifier (objective-id-1) has already been used earlier (in array position 0).

      SCORM 2004 defines a specific error condition and behavior for this scenario (see Section 3.1.7.6.6: Unique Identifier Constraint Violated); however, the SCORM 2004 RTE Version 1.3.1 does not specifically call this error condition out. Table 4.2.17a: Dot- notation Binding for the Objectives Data Model Element does not define this error condition (located in the API Implementation Requirements section).


      1. Rationale For Change

        Due to the ambiguity around how LMS’ should behave under the scenarios described above, the SCORM 2004 RTE Version 1.3.1, specifically Table 4.2.1.17a, will be updated to clearly define the LMS behavior for the handling of identifier collisions.


      2. SCORM Update

        If a SCO tries to set data as described above, the LMS shall set the appropriate error code. Table 4.2.17a will be updated as follows:

        From:


        SetValue(): The LMS shall set the cmi.objectives.n.id to the supplied value in the SetValue() request, set the error code to “0” – No error and return “true”.

        • If the supplied value of the SetValue() does not meet the requirements of the Data Model Element Implementation

          Requirements, then the LMS shall set the error code to 406 – Data Model Element Type Mismatch and return

          false”. The LMS shall not alter the state of the data model element based on the request.

        • Collection data model elements are required to be set in sequential order. If a SCO does not set objectives in a sequential order, then the LMS shall set the error code to 351 – General Set Failure and return “false”. Refer to Section 3.1.7.6: SCORM Extension Error Conditions.

SetValue(): The LMS shall set the cmi.objectives.n.id to the supplied value in the SetValue() request, set the error code to “0” – No error and return “true”.

To:



    1. Clarification and Changes Needed for Non- Tracked Activities

      The SCORM SN Version 1.3.1 does not adequately define LMS behaviors regarding activities that are “not tracked” (Delivery Controls element tracked = false). An interoperability problem may occur when an LMS incorrectly applies read maps (Read Objective Satisfied Status or Read Objective Normalized Measure) from a shared global objective to a “not tracked” activity.


      1. Rationale For Change

        In all cases, when tracking status information for the “not tracked” activity (regardless if the activity is a leaf or a cluster) is required for a sequencing evaluation, the LMS’ sequencing implementation shall apply the default – “unknown” – status to that evaluation. The SCORM 2004 SN Version 1.3.1 will be updated to clearly describe this requirement clarification.


      2. SCORM Update

        Section 3.13.1: Tracked will be updated as follows:

        From:

        The Tracked element indicates whether any tracking status information (refer to Section 4.2: Tracking Model) is being managed for the activity. This element contains a boolean (True/False) value. The default value for Tracked, if not defined explicitly for the activity, is True.

        If the Tracked element on an activity is defined as False, the LMS will behave is if it does not initialize, manage or access any tracking status information for the activity. All evaluations requiring tracking status information will receive the default (“unknown”) value. Activities that have the Tracked element defined as False are not included in any rollup evaluations for their parent.


        To:

        The Tracked element indicates whether any tracking status information (refer to Section 4.2: Tracking Model) is being managed for the activity. This element contains a boolean (True/False) value. The default value for Tracked, if not defined explicitly for the activity, is True.

        If the Tracked element on an activity is defined as False, the LMS will behave is if it does not initialize, manage or access any tracking status information for the activity. All

        evaluations requiring tracking status information will receive the default (“unknown”) value. Activities that have the Tracked element defined as False are not included in any rollup evaluations for their parent.


        ADL Note: Content developers should be aware that declaring an activity “not tracked” (Tracked equals False) will prevent any “read” Objective Maps from being honored since the LMS is not managing any state for the “not tracked” activity. The LMS will return “unknown” for all status evaluations on the “not tracked” activity.


    1. Error in Pseudo Code for the Choice Sequencing Request Process in Dealing with Constrained Chioces

      This addendum addresses a discrepancy with the Choice Sequencing Request Process (SB.2.9), defined in the SCORM 2004 Sequencing and Navigation Version 1.3.1. The pseudo code contains an error that prohibits proper evaluation of a choice navigation request when a constrained activity is encountered.


      1. Rationale for Change

        Because of this error, LMS sequencing implementations cannot properly evaluate a choice navigation request when a constrained activity is encountered. Specifically, line

        12.5.5 is too strict in reducing the set of “constrained choices”. In this line, if the target activity is either a “constrained activity” or the “activity to consider”, then the process fails with an error. However, both of these activities should be included in the constrained set of choices.


      2. SCORM Update

The pseudo code will be updated to permit these two activities to be included in the set of choices. Line 12.5.5 of the Choice Sequencing Request Process (SB.2.9) will be updated to correct this descrepancy.

The updated Choice Sequencing Request Process is reproduced in whole for easy reference.


Choice Sequencing Request Process [SB.2.9] (for a target activity; may return a delivery request; may

change the Current Activity; may return an exception code):

Reference: Activity is Active AM.1.1; Activity is Suspended AM.1.1; Available Children AM.1.1; Check Activity Process UP.5; Choice Activity Traversal Subprocess SB.2.4; Current Activity AM.1.2; End Attempt Process UP.4; Flow Subprocess SB.2.3; Sequencing Control Mode Choice SM.1; Sequencing

Control Choice Exit SM.1; Sequencing Rules Check Process UP.2; Terminate Descendant Attempts Process UP.3; adlseq:constrainedChoice SCORM SN; adlseq:preventActivation SCORM SN

1.

If there is no target activity Then

There must be a

target activity for choice

1.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-1)

Nothing to deliver


End If


2.

If the target activity is not the root of the activity tree Then


2.1.

If the Available Children for the parent of the target activity does not contain the target activity Then

The activity is currently not

available

2.1.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-2)

Nothing to deliver


End If




End If


3.

Form the activity path as the ordered series of activities from the root of the

activity tree to the target activity, inclusive


4.

For each activity in the activity path


4.1.

Apply the Sequencing Rules Check Process to the activity and the Hide from Choice sequencing rules

Cannot choose something that is

hidden

4.2.

If the Sequencing Rules Check Process does not return Nil Then


4.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-3)

Nothing to deliver


End If



End For


5.

If the target activity is not the root of the activity tree Then


5.1.

If the Sequencing Control Mode Choice for the parent of the target activity is False Then

Confirm that control mode

allow ‘choice’ of the target

5.1.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-4)

Nothing to deliver


End If



End If


6.

If the Current Activity is Defined Then

Has the sequencing session already

begun?

6.1.

Find the common ancestor of the Current Activity and the target activity


7.

Else


7.1.

Set common ancestor is the root of the activity tree

No, choosing the target will start the sequencing

session


End If


8.

Case: Current Activity and target activity are identical

Case #1 - select

the current activity

8.1.

Break All Cases

Nothing to do in

this case


End Case


9.

Case: Current Activity and the target activity are siblings

Case #2 - same cluster; move

toward the target activity

9.1.

Form the activity list as the ordered sequence of activities from the

Current Activity to the target activity, exclusive of the target activity

We are attempted to walk toward the target activity.

Once we reach the target activity, we don’t need to test

it.

9.2.

If the activity list is Empty Then

Nothing to choose

9.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-5)

Nothing to deliver


End If


9.3.

If the target activity occurs after the Current Activity in preorder

traversal of the activity tree Then



9.3.1.

traverse is Forward


9.4.

Else


9.4.1.

traverse is Backward



End If


9.5.

For each activity on the activity list


9.5.1.

Apply the Choice Activity Traversal Subprocess to the activity in

the traverse direction


9.5.2.

If the Choice Activity Traversal Subprocess returns False Then


9.5.2.1.

Exit Choice Sequencing Request Process (Delivery Request:

n/a; Exception: the exception identified by the Choice Activity Traversal Subprocess)

Nothing to deliver


End If



End For


9.6.

Break All Cases



End Case


10.

Case: Current Activity and common ancestor are the same Or Current Activity is Not Defined

Case #3 - path to the target is

forward in the activity tree

10.1.

Form the activity path as the ordered series of activities from the

common ancestor to the target activity, exclusive of the target activity


10.2.

If the activity path is Empty Then


10.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-5)

Nothing to deliver


End If


10.3.

For each activity on the activity path


10.3.1.

Apply the Choice Activity Traversal Subprocess to the activity in

the Forward direction


10.3.2.

If the Choice Activity Traversal Subprocess returns False Then


10.3.2.1.

Exit Choice Sequencing Request Process (Delivery Request:

n/a; Exception: the exception identified by the Choice Activity Traversal Subprocess)

Nothing to deliver


End If


10.3.3.

If Activity is Active for the activity is False And (the activity is Not the common ancestor And adlseq:preventActivation for the activity is True) Then

If the activity being considered is not already active, make sure we are allowed to

activate it

10.3.3.1.

Exit Choice Sequencing Request Process (Delivery Request:

n/a; Exception: SB.2.9-6)

Nothing to deliver


End If



End For


10.4.

Break All Cases



End Case


11.

Case: Target activity is the common ancestor of the Current Activity

Case #4 - path to the target is backward in the

activity tree

11.1.

Form the activity path as the ordered series of activities from the

Current Activity to the target activity, inclusive


11.2.

If the activity path is Empty Then


11.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-5)

Nothing to deliver



End If


11.3.

For each activity on the activity path


11.3.1.

If the activity is not the last activity in the activity path Then


11.3.1.1.

If the Sequencing Control Choice Exit for the activity is False

Then

Make sure an activity that should not exit will exit if the

target is delivered.

11.3.1.1.1.

Exit Choice Sequencing Request Process (Delivery

Request: n/a; Exception: SB.2.9-7)

Nothing to deliver


End If



End If



End For


11.4.

Break All Cases



End Case


12.

Case: Target activity is forward from the common ancestor activity

Case #5 - target is a descendant

activity of the common ancestor

12.1.

Form the activity path as the ordered series of activities from the

Current Activity to the common ancestor, inclusive


12.2.

If the activity path is Empty Then


12.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-5)

Nothing to deliver


End If


12.3.

Set constrained activity to Undefined


12.4.

For each activity on the activity path

Walk up the tree to the common

ancestor

12.4.1.

If the activity is not the last activity in the activity path Then


12.4.1.1.

If the Sequencing Control Choice Exit for the activity is False

Then

Make sure an activity that should not exit will exit if the

target is delivered

12.4.1.1.1.

Exit Choice Sequencing Request Process (Delivery

Request: n/a; Exception: SB.2.9-7)

Nothing to deliver


End If



End If


12.4.2.

If constrained activity is Undefined Then

Find the closest constrained activity to the

current activity

12.4.2.1.

If adlseq:constrainedChoice for the activity is True Then


12.4.2.1.1.

Set constrained activity to activity



End If



End If



End For


12.5.

If constrained activity is Defined Then


12.5.1.

If the target activity is Forward in the activity tree relative to the

constrained activity Then


12.5.1.1.

traverse is Forward

‘Flow’ in a forward direction

to see what




activity comes

next

12.5.2.

Else


12.5.2.1.

traverse is Backward

‘Flow’ in a backward direction to see what activity

comes next


End If


12.5.3.

Apply the Choice Flow Subprocess to the constrained activity in

the traverse direction


12.5.4.

Set activity to consider to the activity identified by the Choice Flow

Subprocess


12.5.5.

If the target activity is Not an available descendent of the activity to consider And the target activity is Not the activity to considered And the target activity is Not the constrained activity Then

Make sure the target activity is within the set of ‘flow’ constrained

choices

12.5.5.1.

Exit Choice Sequencing Request Process (Delivery Request:

n/a; Exception: SB.2.9-8)



End If



End If


12.6.

Form the activity path as the ordered series of activities from the

common ancestor to the target activity, exclusive of the target activity


12.7.

If the activity path is Empty Then


12.7.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-5)

Nothing to deliver


End If


12.8.

If the target activity is forward in the activity tree relative to the Current

Activity Then

Walk toward the

target activity

12.8.1.

For each activity on the activity path


12.8.1.1.

Apply the Choice Activity Traversal Subprocess to the activity

in the Forward direction


12.8.1.2.

If the Choice Activity Traversal Subprocess returns False

Then


12.8.1.2.1.

Exit Choice Sequencing Request Process (Delivery Request: n/a; Exception: the exception identified by the

Choice Activity Traversal Subprocess)

Nothing to deliver


End If


12.8.1.3.

If Activity is Active for the activity is False And (the activity is Not the common ancestor And adlseq:preventActivation for the activity is True) Then

If the activity being considered is not already active, make sure we are allowed to

activate it

12.8.1.3.1.

Exit Choice Sequencing Request Process (Delivery

Request: n/a; Exception: SB.2.9-6)

Nothing to deliver


End If



End For


12.9.

Else


12.9.1.

For each activity on the activity path


12.9.1.1.

If Activity is Active for the activity is False And (the activity is

Not the common ancestor And adlseq:preventActivation for the activity is True) Then

If the activity being considered

is not already




active, make sure we are allowed to

activate it

12.9.1.1.1.

Exit Choice Sequencing Request Process (Delivery

Request: n/a; Exception: SB.2.9-6)

Nothing to deliver


End If



End For



End If


12.10.

Break All Cases



End Case


13.

If the target activity is a leaf activity Then


13.1.

Exit Choice Sequencing Request Process (Delivery Request: the target

activity; Exception: n/a)



End If


14.

Apply the Flow Subprocess to the target activity in the Forward direction with consider children equal to True

The identified activity is a cluster. Enter the cluster and attempt to find a descendant leaf to

deliver

15.

If the Flow Subprocess returns False Then

Nothing to deliver, but we succeeded in reaching the target activity - move the

current activity

15.1.

Apply the Terminate Descendent Attempts Process to the common

ancestor


15.2.

Apply the End Attempt Process to the common ancestor


15.3.

Set the Current Activity to the target activity


15.4.

Exit Choice Sequencing Request Process (Delivery Request: n/a;

Exception: SB.2.9-9)

Nothing to deliver

16.

Else


16.1.

Exit Choice Sequencing Request Process (Delivery Request: for the

activity identified by the Flow Subprocess; Exception: n/a)



End If



This page intentionally left blank.


SECTION 3

SCORM 2004

Clarification/Enhancement Addenda


This page intentionally left blank.


    1. Ambiguous Information Defined in the language_type Data Type

      This addendum addresses a clarification to the language found in Section 4.1.1.7: Data Types of the SCORM 2004 RTE Version 1.3.1. The last paragraph found in the language_type section is ambiguous and is not needed in this section. This section is used to describe the specifics of the data types used by the SCORM 2004 RTE Version 1.3.1.


      1. SCORM Update

        The cmi.learner_preference.language data model element, found in Section 4.2.13: Learner Preference, will be updated to add the additional information found in Section

        4.1.1.7: Data Types to further describe the special case of the language_type being an empty characterstring. The Data Model Element Implementation Requirements section will be updated as follows:

        From:


        Data Model Element Implementation Requirements:

        • Data Type: language_type (SPM 250)

        • Value Space: iso-646 [4]

        • Format: Refer to Section 4.1.1.7: Data Types for more information on the requirements for the format of the language_type data type. The default language shall be “” (empty characterstring).


To:


Data Model Element Implementation Requirements:


    1. Clarification of Learner Session Initialization Requirements

      This addendum addresses a clarification in the behavior of the cmi.session_time and

      cmi.exit RTE Data Model elements found in Section 4.2.21: Session Time and Section

      4.2.8: Exit respectively, of the SCORM 2004 RTE Version 1.3.1. The clarification is centered on the how to handle the cmi.session_time and cmi.exit value between learner sessions.


      1. SCORM Update

        The LMS Behavior Requirements section of the cmi.session_time and cmi.exit data model element found in Section 4.2.21: Session Time and Section 4.2.8: Exit respectively, will be updated to clarify behavior on handling the cmi.session_time value between learner sessions as follows:

        Section 4.2.8: Exit

        From:


        LMS Behavior Requirements:

        • The data model element is mandatory and shall be implemented by an LMS as write- only.

        • The value is completely controlled by the SCO. The SCO is responsible for setting this value. If the SCO does not set the cmi.exit data model element, then the default value (empty characterstring – “”) shall be used. If the LMS receives a request to get the cmi.exit value, then the LMS shall adhere to the requirements listed below for API Implementation Requirements.


To:


LMS Behavior Requirements:


Section 4.2.21: Session Time

From:


LMS Behavior Requirements:


To:


LMS Behavior Requirements:


    1. Setting the Current Activity to None

      This addendum addresses a clarification in the SCORM 2004 SN Version 1.3.1 to explicitly define when an LMS should set the Global State Information (SCORM 2004 SN Version 1.3.1, Section 4.2.1.6: Global State Information) Current Activity element to None (or undefined).


      1. SCORM Update

        The first paragraph of Section 2.3: Starting and Stopping a Sequencing Session will be updated as follows:

        From:


        A Sequencing Session is the time from when an attempt on the root activity of an Activity Tree begins until that attempt ends. The SCORM Sequencing Behaviors only specify which navigation requests can begin a sequencing session, but they do not specify when or how those navigation requests are triggered. Generally, the LMS will issue a Start navigation request in recognition of some system event, e.g., a login, begin course, etc. It is recommended, if the previous sequencing session ended due to a Suspend All navigation request, the LMS should issue a Resume All navigation request instead of a Start.

To:


A Sequencing Session is the time from when an attempt on the root activity of an Activity Tree begins until that attempt ends; outside of the context of a Sequencing Session the Current Activity is considered to be undefined. The SCORM Sequencing Behaviors only specify which navigation requests can begin a Sequencing Session, but they do not specify when or how those navigation requests are triggered. Generally, the LMS will issue a Start navigation request in recognition of some system event, e.g., a login, begin course, etc. It is recommended, if the previous sequencing session ended due to a Suspend All navigation request, the LMS should issue a Resume All navigation request instead of a Start.

The first set of steps defined in Section 4.3.1: Sequencing Loop will be updated as follows:

Begin Sequencing Session

(1)

The learner initiates access to the LMS (e.g., accesses the system, logs in, etc.) and establishes a context within a particular unit of instruction (e.g., selects a course, a content organization, etc.).

From:



(2)

(3)

The LMS initiates a sequencing process by issuing a Start, Resume All, or Choice

navigation request.

The Navigation Behavior translates the Start, Resume All, or Choice navigation request into the appropriate sequencing request and processes it. The sequencing session “officially” begins when an activity is identified for delivery – one successful pass through the following Sequencing Loop.

Begin Sequence Session **:

(1)

The learner initiates access to the LMS (e.g., accesses the system, logs in, etc.) and establishes a context within a particular unit of instruction (e.g., selects a course, a content organization, etc.).

** Prior to the beginning of a sequencing session, the Current Activity shall be considered to be None (or undefined).

(2)


(3)

The LMS initiates a sequencing process by issuing a Start, Resume All, or Choice

navigation request.

The Navigation Behavior translates the Start, Resume All, or Choice navigation request into the appropriate sequencing request and processes it. The sequencing session “officially” begins when an activity is identified for delivery – one successful pass through the following Sequencing Loop.

To:



    1. Incorrect Rollup Condition Definition

      This addendum addresses inconsistency between some of the tables provided in the IMS Simple Sequencing (SS) Specification Version 1.0 and the SCORM 2004 SN Version 1.3.1.


      1. Rationale For Change

        Some of the tables identified in the Sequencing Definition Model section of the IMS SS Version 1.0 are inconsistent with the tables in the SCORM 2004 SN Version 1.3.1.

        For example, there is a discrepancy between the definition of Objective Measure Known in Table 3.7.2a and Table 3.4.2a of the SCORM 2004 SN Version 1.3.1. The correct language for Table 3.7.2a should read: “Objective Measure Known – The condition evaluates to True if the Objective Measure Status for the rolled-up objective associated with the child activity is True.” The correct language for Table 3.2.2a should read: “Objective Measure Known – The condition evaluates to True if the Objective Measure Status for the objective associated with the activity (indicated by the Referenced Objective) is True.”


      2. SCORM Update

        The SCORM 2004 SN Version 1.3.1 will be updated to reflect the language in the IMS SS specification. Other tables that may be affected will also be updated.


    2. Ambiguous Language for the timeinterval(second, 10,2) Data Requirements

      This addendum addresses ambiguity in the timeinterval(second,10,2) value requirements, as defined in the SCORM 2004 RTE Version 1.3.1.


      1. Rationale For Change

        Section 4.1.1.7: Data Types of the SCORM 2004 RTE Version 1.3.1 states:

        “The character literals designators “P”,”Y”,”M”,”D”,”T”,”H”,”M”,”S” shall appear if the corresponding non-zero value is present.”

        However, the "P" is always required. "T" is required if hours, minutes or seconds are used. The current language implies that they can be left off if the corresponding value for the literal is zero.


      2. SCORM Update

        The language in question for the timeinterval(second, 10,2) value will be updated to state:

        “If the data model element, that is of type timeinterval(second,10,2) contains a value, then the designator P shall be present. If the value of years, months, days, hours, minutes or seconds is zero, the value and corresponding designation (e.g., Y if there is no year) may be omitted, but at least one designator and value shall be present in addition to the designator P. The designator T shall be omitted if all of the time components (hours, minutes, and seconds) are zero.”


    3. Incorrect Completion Status Determination/Success Status Determination Operators

      This addendum addresses incorrect Completion Status Determination and Success Status Determination operators, as found in the SCORM 2004 RTE Version 1.3.1.


      1. Rationale For Change

        Table 4.2.4.1a Completion Status Determination incorrectly use the > (greater than) operator. Some of the information in the LMS Behavior column incorrectly describes the condition of a value being greater than (>)another value. The correct condition should be that the value should be greater than or equal (>=) another value.


      2. SCORM Update

        Table 4.2.4.1a will be updated accordingly to include the correct operator. The table will be updated to change the operator to >=.


    4. Conflicting Definitions of <adlnav:presentation> Element

      This addendum addresses conflicting definitions of the <adlnav:presentation> element in the SCORM 2004 CAM Version 1.3.1.


      1. Rationale For Change

        Section 5.2.1.1: <presentation> Element states that: “The element shall only appear, if needed, as a child of a leaf <item> element that references a SCO.” Section 5.2.1.1.1.1:

        <hideLMSUI> Element (which is a descendant of the <presentation> element) states that its values applies “when a child of this activity cluster is the current activity,” which means this activity is cluster and has children. These definitions contradict one another. The <hideLMSUI> element is intended to affect only the leaf activity it is applied to.


      2. SCORM Update

        Section 5.2.1.1.1.1: <hideLMSUI> Element will be updated to reflect the intended application of the <presentation> element (Section 5.2.1.1: <presentation> Element). The definition of the <hideLMSUI> elements affects will be updated as follows:

        • previous : If specified, the LMS shall not display a “Previous” navigation device when this activity is the current activity.

        • continue : If specified, the LMS shall not display a “Continue” navigation device when this activity is the current activity.

        • exit : If specified, the LMS shall not display an “Exit” navigation device when this activity is the current activity.

        • abandon : If specified, the LMS shall not display a “Abandon” navigation device when this activity is the current activity.


    5. Root of the Activity Tree Cannot be Targeted for Choice

      This addendum addresses missing pseudo code in the Navigation Request Process (NB.2.1) that prevents the root of the Activity Tree from being targeted for choice after the sequencing session has already begun.


      1. Rationale For Change

        The Navigation Request Process (NB.2.1) is missing pseudo code that would allow the root of an Activity Tree from being targeted with a Choice Navigation Request after the sequencing session has already begun. Furthermore, if the root of the Activity Tree is targeted by a Choice Navigation Request, an exception will be thrown on line 7.1.1.2.4.1 – “No Activities to Consider.” This is incorrect behavior. The intent of the Choice Navigation Request is that any activity can be targeted for choice, including the root.


      2. SCORM Update

        The pseudo code that allows the root of the Activity Tree to be targeted by a Choice Navigation Request after the sequencing session has begun will be added. The fix for this is to remove the phrase:, “excluding the common ancestor” from line 7.1.1.2.2. This fix causes targeting the root of the Activity tree to result in an activity path of one activity, the root, and clause 7.1.1.2.3.* will process the request successfully.

        From:


        Navigation Request Process [NB.2.1] (for a navigation request and possibly a specified activity, returns the validity of the navigation request; may return a termination request, a sequencing request, and/or a target

        activity; may return an exception code):

        Reference: Current Activity AM.1.2; Sequencing Control Choice SM.1; Sequencing Control Choice Exit SM.1; Sequencing Control Flow SM.1; Sequencing Control Forward Only SM.1; Suspended Activity

        AM.1.2

        1.

        Case: navigation request is Start


        1.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session

        has not already begun.

        1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: n/a; Sequencing Request: Start;

        Target Activity: n/a; Exception: n/a)


        1.2.

        Else


        1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-1)



        End If



        End Case



        2.

        Case: navigation request is Resume All


        2.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session has not already

        begun

        2.1.1.

        If the Suspended Activity is Defined Then

        Make sure the previous sequencing session ended with a

        suspend all request

        2.1.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: n/a; Sequencing Request:

        Resume All; Target Activity: n/a; Exception: n/a)


        2.1.2.

        Else


        2.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-3)



        End If


        2.2.

        Else


        2.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-1)



        End If



        End Case


        3.

        Case: navigation request is Continue


        3.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session

        has already begun

        3.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If


        3.2.

        If the Current Activity is not the root of the activity tree And the Sequencing Control Flow for the parent of the Current Activity is True Then

        Validate that a ‘flow’ sequencing request can be

        processed from the current activity

        3.2.1.

        If the Activity is Active for the Current Activity is True Then

        If the current activity has not been terminated, terminate the

        current the activity

        3.2.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: Exit; Sequencing Request:

        Continue; Target Activity: n/a; Exception: n/a)


        3.2.2.

        Else


        3.2.2.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: n/a; Sequencing Request:

        Continue; Target Activity: n/a; Exception: n/a)



        End If


        3.3.

        Else


        3.3.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-4)

        Flow is not enabled or the current activity is the root




        of the activity tree


        End If



        End Case


        4.

        Case: navigation request is Previous


        4.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session

        has already begun

        4.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If


        4.2.

        If the Current Activity is not the root of the activity tree Then

        There is no activity logically ‘previous’ to the root of the

        activity tree

        4.2.1.

        If the Sequencing Control Flow for the parent of the Current Activity is True And the Sequencing Control Forward Only for the parent of the Current Activity is False Then

        Validate that a ‘flow’ sequencing request can be processed from the

        current activity

        4.2.1.1.

        If the Activity is Active for the Current Activity is True Then

        If the current activity has not been terminated, terminate the

        current the activity

        4.2.1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: Exit; Sequencing Request: Previous; Target Activity: n/a; Exception:

        n/a)


        4.2.1.2.

        Else


        4.2.1.2.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Previous; Target Activity: n/a; Exception:

        n/a)



        End If


        4.2.2.

        Else


        4.2.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-5)

        Violates control mode


        End If


        4.3.

        Else


        4.3.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-6)

        Cannot move backward from the root of the activity

        tree


        End If



        End Case


        5.

        Case: navigation request is Forward

        Behavior not

        defined

        5.1.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-7)




        End Case


        6.

        Case: navigation request is Backward

        Behavior not

        defined

        6.1.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-7)



        End Case


        7.

        Case: navigation request is Choice


        7.1.

        If the activity specified by the Choice navigation request exists within the activity tree Then

        Make sure the target activity

        exists in the activity tree

        7.1.1.

        If the activity specified by the Choice navigation request is the root of the activity tree Or the Sequencing Control Choice for the parent of the activity specified by the Choice navigation request is True Then

        Validate that a ‘choice’ sequencing request can be processed on the target

        activity

        7.1.1.1.

        If the Current Activity is Not Defined Then

        Attempt to start the sequencing session

        through choice

        7.1.1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)



        End If


        7.1.1.2.

        If the activity specified by the Choice navigation request is

        Not a sibling of the Current Activity Then

        We are always allowed to choose a sibling of the

        current activity

        7.1.1.2.1.

        Find the common ancestor of the Current Activity and

        the activity specified by the Choice navigation request


        7.1.1.2.2.

        Form the activity path as the ordered series of activities from the Current Activity to the common ancestor, excluding the common ancestor

        The common ancestor will not terminate as a result of processing the choice sequencing request, unless the common ancestor is the Current Activity – the current activity should always be included in the

        activity path

        7.1.1.2.3.

        If the activity path is Not Empty Then


        7.1.1.2.3.1.

        For each activity in the activity path

        Make sure that ‘choosing’ the target will not force an active activity to terminate, if that activity does not allow choice to

        terminate it


        7.1.1.2.3.1.1.

        If Activity is Active for the activity is True

        And the Sequencing Control Choice Exit for the activity is False Then


        7.1.1.2.3.1.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a;

        Exception: NB.2.1-8)

        Violates control mode


        End If



        End For


        7.1.1.2.4.

        Else


        7.1.1.2.4.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a;

        Exception: NB.2.1-9)



        End If



        End If


        7.1.1.3.

        If the Activity is Active for the Current Activity is True

        Then

        If the current activity has not been terminated,

        terminate the current the activity

        7.1.1.3.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: Exit; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)


        7.1.1.4.

        Else


        7.1.1.4.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)



        End If


        7.1.2.

        Else


        7.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-10)

        Violates control mode


        End If


        7.2.

        Else


        7.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-11)

        Target activity does not exist


        End If



        End Case


        8.

        Case: navigation request is Exit


        8.1.

        If the Current Activity is Defined Then

        Make sure the sequencing session

        has already begun

        8.1.1.

        If the Activity is Active for the Current Activity is True Then

        Make sure the current activity has

        not already been terminated

        8.1.1.1.

        Exit Navigation Request Process (Navigation Request:




        Valid; Termination Request: Exit; Sequencing Request:

        Exit; Target Activity: n/a) ; Exception: n/a)


        8.1.2.

        Else


        8.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-12)

        Activity has already terminated


        End If


        8.2.

        Else


        8.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        9.

        Case: navigation request is Exit All


        9.1.

        If the Current Activity is Defined Then

        If the sequencing session has already begun, unconditionally

        terminate all active activities

        9.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Exit All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        9.2.

        Else


        9.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        10.

        Case: navigation request is Abandon


        10.1.

        If the Current Activity is Defined Then

        Make sure the

        sequencing session has already begun

        10.1.1.

        If the Activity is Active for the Current Activity is True Then

        Make sure the current activity has not already been

        terminated

        10.1.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: Abandon; Sequencing Request: Exit; Target Activity: n/a; Exception: n/a)


        10.1.2.

        Else


        10.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-12)



        End If


        10.2.

        Else


        10.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        11.

        Case: navigation request is Abandon All


        11.1.

        If the Current Activity is Defined Then

        If the sequencing

        session has already




        begun, unconditionally

        abandon all active activities

        11.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Abandon All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        11.2.

        Else


        11.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        12.

        Case: navigation request is Suspend All


        12.1.

        If the Current Activity is Defined Then

        If the sequencing session has already

        begun

        12.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Suspend All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        12.2.

        Else


        12.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        13.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Sequencing Request: n/a; Termination Request: n/a; Target Activity:

        n/a; Exception: NB.2.1-13)

        Undefined navigation request

        pseudo code for navigation request process


        To:


        Navigation Request Process [NB.2.1] (for a navigation request and possibly a specified activity, returns the

        validity of the navigation request; may return a termination request, a sequencing request, and/or a target activity; may return an exception code):

        Reference: Current Activity AM.1.2; Sequencing Control Choice SM.1; Sequencing Control Choice Exit SM.1; Sequencing Control Flow SM.1; Sequencing Control Forward Only SM.1; Suspended Activity

        AM.1.2

        1.

        Case: navigation request is Start


        1.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session has not already

        begun.

        1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: n/a; Sequencing Request: Start;

        Target Activity: n/a; Exception: n/a)


        1.2.

        Else


        1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-1)



        End If



        End Case


        2.

        Case: navigation request is Resume All



        2.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session

        has not already begun

        2.1.1.

        If the Suspended Activity is Defined Then

        Make sure the previous sequencing session ended with a

        suspend all request

        2.1.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: n/a; Sequencing Request:

        Resume All; Target Activity: n/a; Exception: n/a)


        2.1.2.

        Else


        2.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-3)



        End If


        2.2.

        Else


        2.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-1)



        End If



        End Case


        3.

        Case: navigation request is Continue


        3.1.

        If the Current Activity is Not Defined Then

        Make sure the sequencing session

        has already begun

        3.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If


        3.2.

        If the Current Activity is not the root of the activity tree And the Sequencing Control Flow for the parent of the Current Activity is True Then

        Validate that a ‘flow’ sequencing request can be

        processed from the current activity

        3.2.1.

        If the Activity is Active for the Current Activity is True Then

        If the current activity has not been terminated, terminate the

        current the activity

        3.2.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: Exit; Sequencing Request:

        Continue; Target Activity: n/a; Exception: n/a)


        3.2.2.

        Else


        3.2.2.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: n/a; Sequencing Request:

        Continue; Target Activity: n/a; Exception: n/a)



        End If


        3.3.

        Else


        3.3.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-4)

        Flow is not enabled or the current activity is the root

        of the activity tree



        End If



        End Case


        4.

        Case: navigation request is Previous


        4.1.

        If the Current Activity is Not Defined Then

        Make sure the

        sequencing session has already begun

        4.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If


        4.2.

        If the Current Activity is not the root of the activity tree Then

        There is no activity logically ‘previous’ to the root of the

        activity tree

        4.2.1.

        If the Sequencing Control Flow for the parent of the Current Activity is True And the Sequencing Control Forward Only for the parent of the Current Activity is False Then

        Validate that a ‘flow’ sequencing request can be

        processed from the current activity

        4.2.1.1.

        If the Activity is Active for the Current Activity is True Then

        If the current activity has not been terminated, terminate the

        current the activity

        4.2.1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: Exit; Sequencing Request: Previous; Target Activity: n/a; Exception:

        n/a)


        4.2.1.2.

        Else


        4.2.1.2.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Previous; Target Activity: n/a; Exception:

        n/a)



        End If


        4.2.2.

        Else


        4.2.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-5)

        Violates control mode


        End If


        4.3.

        Else


        4.3.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-6)

        Cannot move backward from the root of the activity

        tree


        End If



        End Case


        5.

        Case: navigation request is Forward

        Behavior not

        defined

        5.1.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-7)



        End Case


        6.

        Case: navigation request is Backward

        Behavior not

        defined


        6.1.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a; Exception: NB.2.1-7)



        End Case


        7.

        Case: navigation request is Choice


        7.1.

        If the activity specified by the Choice navigation request exists within the activity tree Then

        Make sure the target activity

        exists in the activity tree

        7.1.1.

        If the activity specified by the Choice navigation request is the root of the activity tree Or the Sequencing Control Choice for the parent of the activity specified by the Choice navigation request is True Then

        Validate that a ‘choice’ sequencing request can be processed on the target

        activity

        7.1.1.1.

        If the Current Activity is Not Defined Then

        Attempt to start the sequencing session

        through choice

        7.1.1.1.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)



        End If


        7.1.1.2.

        If the activity specified by the Choice navigation request is

        Not a sibling of the Current Activity Then

        We are always allowed to choose a sibling of the

        current activity

        7.1.1.2.1.

        Find the common ancestor of the Current Activity and

        the activity specified by the Choice navigation request


        7.1.1.2.2.

        Form the activity path as the ordered series of activities from the Current Activity to the common ancestor, excluding the common ancestor

        The common ancestor will not terminate as a result of processing the choice sequencing request, unless the common ancestor is the Current Activity – the current activity should always be included in the

        activity path

        7.1.1.2.3.

        If the activity path is Not Empty Then


        7.1.1.2.3.1.

        For each activity in the activity path

        Make sure that ‘choosing’ the target will not force an active activity to terminate, if that activity does not allow choice to

        terminate it

        7.1.1.2.3.1.1.

        If Activity is Active for the activity is True

        And the Sequencing Control Choice Exit for the activity is False Then



        7.1.1.2.3.1.1.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a;

        Exception: NB.2.1-8)

        Violates control mode


        End If



        End For


        7.1.1.2.4.

        Else


        7.1.1.2.4.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request: n/a; Target Activity: n/a;

        Exception: NB.2.1-9)



        End If



        End If


        7.1.1.3.

        If the Activity is Active for the Current Activity is True

        Then

        If the current activity has not been terminated,

        terminate the current the activity

        7.1.1.3.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: Exit; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)


        7.1.1.4.

        Else


        7.1.1.4.1.

        Exit Navigation Request Process (Navigation Request: Valid; Termination Request: n/a; Sequencing Request: Choice; Target Activity: the activity specified by the Choice navigation request;

        Exception: n/a)



        End If


        7.1.2.

        Else


        7.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Termination Request: n/a; Sequencing Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-10)

        Violates control mode


        End If


        7.2.

        Else


        7.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-11)

        Target activity does not exist


        End If



        End Case


        8.

        Case: navigation request is Exit


        8.1.

        If the Current Activity is Defined Then

        Make sure the sequencing session

        has already begun

        8.1.1.

        If the Activity is Active for the Current Activity is True Then

        Make sure the current activity has not already been

        terminated

        8.1.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: Exit; Sequencing Request:

        Exit; Target Activity: n/a) ; Exception: n/a)


        8.1.2.

        Else



        8.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-12)

        Activity has already terminated


        End If


        8.2.

        Else


        8.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        9.

        Case: navigation request is Exit All


        9.1.

        If the Current Activity is Defined Then

        If the sequencing session has already begun, unconditionally terminate all active

        activities

        9.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Exit All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        9.2.

        Else


        9.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        10.

        Case: navigation request is Abandon


        10.1.

        If the Current Activity is Defined Then

        Make sure the

        sequencing session has already begun

        10.1.1.

        If the Activity is Active for the Current Activity is True Then

        Make sure the current activity has not already been

        terminated

        10.1.1.1.

        Exit Navigation Request Process (Navigation Request:

        Valid; Termination Request: Abandon; Sequencing Request: Exit; Target Activity: n/a; Exception: n/a)


        10.1.2.

        Else


        10.1.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request:

        n/a; Target Activity: n/a; Exception: NB.2.1-12)



        End If


        10.2.

        Else


        10.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        11.

        Case: navigation request is Abandon All


        11.1.

        If the Current Activity is Defined Then

        If the sequencing session has already begun, unconditionally

        abandon all active




        activities

        11.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Abandon All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        11.2.

        Else


        11.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        12.

        Case: navigation request is Suspend All


        12.1.

        If the Current Activity is Defined Then

        If the sequencing

        session has already begun

        12.1.1.

        Exit Navigation Request Process (Navigation Request: Valid;

        Termination Request: Suspend All; Sequencing Request: Exit;

        Target Activity: n/a; Exception: n/a)


        12.2.

        Else


        12.2.1.

        Exit Navigation Request Process (Navigation Request: Not Valid; Sequencing Request: n/a; Termination Request: n/a;

        Target Activity: n/a; Exception: NB.2.1-2)



        End If



        End Case


        13.

        Exit Navigation Request Process (Navigation Request: Not Valid;

        Sequencing Request: n/a; Termination Request: n/a; Target Activity:

        n/a; Exception: NB.2.1-13)

        Undefined navigation request

        pseudo code for navigation request process


    6. Choice Exit not Enforced on the Activity Tree Root

      This addendum addresses a missing clause to enforce Choice Exit on the Activity Tree Root in the Navigation Request Process (NB.2.1).


      1. Rationale For Change

        If the root of the Activity Tree has Choice Exit = false, this would indicate that the content designer intends that a new attempt on the root activity cannot be initiated through a Choice Navigation Request – a learner cannot “restart” the Activity Tree by selecting its root.

        The Navigation Request Process (NB.2.1) is missing a clause to enforce Choice Exit = false on the root of the Activity Tree, although it enforces this constraint on all other activities in the tree (see line 7.1.1.2.3.1.1.). In this situation, the Navigation Request Process (incorrectly) allows the root of the activity tree to be the target of a Choice Navigation Request; processing this request would result in the current activity’s content being unloaded and a subsequent failure of processing the Choice Sequencing Request.


      2. SCORM Update

NB.2.1 will be updated so that the root of the activity tree can be targeted by a Choice Navigation Request when it has Choice Exit = false. The fix for this is to remove, “excluding the common ancestor” from line 7.1.1.2.2 – this is the same fix proposed in Section 3.8: Root of the Activity Tree Cannot be Targeted for Choice. See this section for more details on the exact change.


This page intentionally left blank.


APPENDIX A

Acronym Listing


This page intentionally left blank.


Acronym Listing


ADL

Advanced Distributed Learning

API

Application Programming Interface

CAM

Content Aggregation Model

IEEE

Institute of Electrical and Electronics Engineers

IETF

Internet Engineering Task Force

LMS

Learning Management System

RFC

Request For Comment

RTE

Run-Time Environment

SCO

Sharable Content Object

SCORM

Sharable Content Object Reference Model

SN

Sequencing and Navigation

SPM

Smallest Permitted Maximum

SS

Simple Sequencing

URL

Universal Resource Locator

XML

Extensible Markup Language


This page intentionally left blank.


APPENDIX B

Document Revision History


This page intentionally left blank.



Document Revision History


Version

Release Date

Description of Change

1.0

09/15/2004

Initial Version.


Added the following Defect Addenda:

  • Addendum: Handling of Invalid SetValue() Requests for Data Model Element Collections

  • Addendum: Ambiguous Pseudo-Code in Case #4 of Choice Sequencing Request Process

  • Addendum: Misevaluation of Traversal Direction

  • Addendum: Measure Rollup Should not be Applied to Leaf Activities

  • Addendum: Invalid Default Value defined for the measureSatisfactionIfActive attribute

  • Addendum: Incorrect SPM for the <dataFromLMS> Element

  • Addendum: Handling of Reserved Delimiters

  • Addendum: Deprecating the adlcp:persistState Attribute Added the following Clarification/Enhancement Addenda:

  • Addendum: Ambiguous information defined in the language_type Data Type

  • Addendum: Clarification of Learner Session Initialization Requirements

  • Addendum: Setting the Current Activity to None

1.1

10/29/2004

Added the following Defect Addenda:

  • Addendum: Language Type Syntax

  • Addendum: Objective Satisfied By Measure Evaluation Behavior Discrepancy

  • Addendum: Manifest Requirements Inconsistency

  • Addendum: Error in Pseudo-Code Limit Conditions Check Process

  • Addendum: Error in Pseudo-Code Choice Flow Tree Traversal Sub-process

  • Addendum: Error in Pseudo-Code Previous Sequencing Request Process

  • Addendum: Application of Measure Satisfaction if Active Behavior

  • Addendum: Initialization of a SCO’s Objectives from Sequencing Information

  • Addendum: Error in Pseudo-Code Navigation Request Process

    Added the following Clarification/Enhancement Addenda:

  • Addendum: Incorrect Rollup Condition Definition




  • Addendum: Ambiguous Language for the timeinterval(second,10,2) Data Requirements

  • Addendum: Incorrect Completion Status Determination/Success Status Determination Operators

1.2

4/15/2005

Added the following Defect Addenda:

  • Addendum 2.17: Variable Error in Measure Rollup Process (RB.1.1)

  • Addendum 2.18: Incorrect definition of Extended Rollup Set

  • Addendum 2.19: Portability (Interoperability) of URLs between Windows and UNIX Systems

  • Addendum 2.20: The <adlnav:presentation> Element Should be Permitted on an Asset Resource

  • Addendum 2.21: Default Value for timeinterval(second,10,2) Should be any Value that Evaluates to Zero

  • Addendum 2.22: Exit Action Rule on the Activity Tree Root does not End the Sequencing Session

  • Addendum 2.23: The Completion Status Value of “not attempted” is Not Mapped to Sequencing Tracking Information

  • Addendum 2.24: Undefined Behavior for LMS Handling of Unique Identifier Collisions

  • Addendum 2.25: Clarification and Changes Needed for Non-Tracked Activities

  • Addendum 2.26: Error in Pseudo-Code for the Choice Sequencing Request Process in Dealing with Constrained Choices

    Added the following Clarification/Enhancement Addenda:

  • Addendum 3.8: Root of the Activity Tree Cannot be Targeted for Choice

  • Addendum 3.9: Choice Exit not Enforced on the Activity Tree Root